|
Electricity, Heating, Solar And Nuclear Energy – Purchase And Distribution Of Thermal Energy For The Facilities Of The Sports And Recreation Center Of The Capital City Of Warsaw. Warsaw In The Targówek District. Facility No. 1 - Polonez Swimming Pool At Ul. Łabiszyńska 20 - Type Of Heating Substation: Series-Parallel - Tariff Group: A3/B1/C3 The Ordering Party Will Require That The Power Supply As A Function Of The External Temperature Takes Place In Accordance With The Table Below. Tab. Dependence Of Heat Demand In Relation To The External Air Temperature. External Air Temperature Heat Demand [°C] [Kw] 30,300 8,432 -20,600 Due To The Variable Temperature Of The Medium, Depending On The External Temperature, The Heating Medium Flow Capacity Must Be Ensured In An Amount Enabling The Supply Of Thermal Energy In Accordance With The Above Requirement. Particular Attention Should Be Paid To The Fact That The Requirement For The Highest Heating Medium Flow Will Occur In The Transition Period, I.E. At Tz = +8 Degrees Celsius. The Facility Will Feature A Heat Consumption Optimization System Whose Task Will, Among Other Things, Average Heating Power Consumption And Eliminate Short-Term Simultaneous Peak Heating Power Consumption By Many Consumers. This Purpose Will Be Served, Among Others, By The Large Thermal Capacity Of The Swimming Pool Basins, Treated By The System As A Heat Storage Facility. Therefore, We Do Not Provide The Installed Power Divided Into Individual Consumers (Ct, Domestic Hot Water, Central Heating), But The Table Above. Planned Consumption Of Thermal Energy - 8,000 Gj/Year Technical Conditions: Heat Node - Property Of The Ordering Party Measurement And Billing System Measuring: Total Heat Supplied To The Node - Property Of The Contractor Heat For Heating (Central Heating) - Not Applicable Heat For Hot Water (Dhw) - Not Applicable Heat For Central Heating. – Not Applicable Δp/V Controller – Property Of The Contractor (Ownership Of The Relevant Heating System Operator (Osd)) Weather Controller – Property Of The Ordering Party Building Characteristics • Year Of Construction - 2003 • Year Of Connection To M.S.C. - 2003 • Total Area Of The Building - Unit M2 - 4097.6 • Cubic Capacity Of The Building - Unit M3 - 28886 Facility No. 2 - Pavilion Sports And Administrative Center At Ul. Łabiszyńska 20 A The Subject Of The Order Is The Supply Of District Heating To The Sports Pavilion At Ul. Łabiszyńska 20A In Warsaw, For The Needs Of Central Heating (Co), Technological Heat (Ct) And Preparation Of Domestic Hot Water (Cwu). Technical Parameters: • Ordered Power: 186 Kw, • Thermal Power For Central Heating: 92 Kw, • Thermal Power For Ct: 71 Kw, • Maximum Thermal Power For Dhw: 85 Kw, • Average Dhw Power Used To Determine The Ordered Power: 23 Kw, • Heat Carrier Flow In Winter: 2.3 M³/H, • Heat Carrier Flow In Summer: 1.8 M³/H, • Parameters Of The Central Heating System: 70/50°C, • Total Area Of The Facility: 1,916.87 M², • Volume Of The Facility: 7,206 M³. Heat Will Be Supplied In Accordance With Applicable Regulations, Technical Conditions Of Delivery, Tariff Of The Relevant Energy Company And The Provisions Of The Contract. The Delivered Heat Will Be Settled On The Basis Of
|