1. The Subject Of The Order Is The Adaptation Of An Existing Farm Building For Storage Purposes.2.The Order Is Being Implemented As Part Of A Targeted Subsidy From The State Budget To Co-Finance Tasks Under The Program Called Civil Protection And Civil Defense Program For 2025-2026.3.Detailed Description Of The Subject Of The Order: The Subject Of The Order Are Construction Works Consisting In The Adaptation (Reconstruction With Change Of Use) Of An Existing Farm Building For Storage Purposes. The Facility Is Located On The Premises Of The Special Educational Center In Łupki, Part Of Plot No. 52/1, Łupki District, Pisz Commune, Pisz Poviat. The Facility Is Located In A Historic Manor Park. The Warmia-Masuria Voivodeship Conservator Of Monuments Granted The Appropriate Permit To Carry Out The Work In Accordance With The Conditions Specified In The Permit. Characteristic Parameters Of The Facility: - Usable Area = 324.89 M2 - Total Area = 332.94 M2 - Building Area = 332.94 M2 - Cubic Capacity = 1,592.30 M3 - Number Of Storeys = 1 (Ground Floor) - Height = 5.66 M Description Of Construction Works: 1) Demolition And Dismantling Works, Including: - Dismantling The Existing Roof Covering Made Of Trapezoidal Sheet Metal - Dismantling The Cladding Of Parts Of The Walls Made Of Trapezoidal Sheet Metal - Dismantling The Existing Window And Door Joinery - Dismantling The Existing Brick Curtain Walls - Dismantling The Existing Electrical Installation - Removal And Disposal Of Demolition Materials2) Works Construction, Including: - Roof Casing Made Of 10 Cm Thick Sandwich Panels With A Mineral Wool Core - Installation Of The Necessary Roof Treatments, I.E. Ridge Tiles, Wind Girders, Eaves And Gutters - Construction Of A Steel Substructure For The Designed Wall Casing Made Of Sandwich Panels - Wall Casing Made Of 10 Cm Thick Sandwich Panels With A Mineral Wool Core - Installation Of A Sectional Entrance Gate To The Facility With A Built-In Door - Flooring Works Related To The Construction Of An Industrial Floor - Construction Of A Gravel Band At The External Walls Of The Facility3) Electrical Installation Works, Including: - Installation Of A Pwp Fire Protection Switch - Re Electrical Switchboard - Lighting Connector At The Sosw Building - Retrofitting - Socket/Power Installation - Emergency Lighting Installation - General Internal And External Lighting Installation - Earthing And Lightning Protection Installation - Earthworks And Laying Power Cables - Acceptance Tests And Measurements Characteristic Quantities Of The Scope Of Work: - Construction Of The Roof Cladding Made Of 10 Cm Thick Mineral Wool Sandwich Panels = Approximately 360.00 M2 - Construction Of Wall Cladding With 10 Cm Thick Mineral Wool Sandwich Panels = Approximately 306.00 M2 - Installation Of Segmented Entrance Gates - 1 Set - Construction Of An Industrial Concrete Floor With A Base Layer And Insulation = Approximately 325.00 M2 - Construction Of A Gravel Band Around The Facility = Approxima
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 118203161
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.