Object.The Object Of The Public Procurement Is Construction, Including The Design And Implementation Of Construction In The Sense Of Article 3, Paragraph 1, Item 1, Letter B Of The Law On Public Procurement (Ppa), With The Subject: Implementation Of Engineering (Design, Author Supervision And Construction) Of The Object/Construction: Restoration Of A Retaining Wall And Water Supply On Municipal Road Sml 2133 /Ііі-867, Madan-Tsatsarovtsi/ - Bukovo - Bukova Polyana - /Ііі-865/ In The Section At Km 6+240, Located In The Land Of Bukovo Village, Madan Municipality. Implementation Activities.Activities For The Implementation Of The Public Order Cover:- Preparation Of An Investment Project In All Parts For The Implementation Of Construction Works On A Site/Construction: Reconstruction Of A Retaining Wall And Culvert On The Municipal Road Sml 2133 /Ііі-867, Madan-Tsatsarovtsi/ - Bukovo - Bukova Polyana - /Ііі-865/ In The Section At Km 6+240, Located In The Land Of The Village Of Bukovo, Madan Municipality;- Execution Of Construction Works On A Site/Construction: Restoration Of Retaining Wall And Culvert On Municipal Road Sml 2133 /Ііі-867, Madan-Tsatsarovtsi/ - Bukovo - Bukova Polyana - /Ііі-865/ In The Section At Km 6+240, Located In The Land Of Bukovo Village, Madan Municipality;- Authors Supervision Of All Parts By The Designers, Carried Out During The Implementation Of Construction Works On A Site/Construction: Restoration Of A Retaining Wall And Culvert On The Municipal Road Sml 2133 /Ііі-867, Madan-Tsatsarovtsi/ - Bukovo - Bukova Polyana - /Ііі-865/ In The Section At Km 6+240, Located In The Land Of The Village Of Bukovo, Madan Municipality.Scope Of Performance.The Scope Of This Public Procurement Includes The Implementation Of An Engineering Task, Including The Preparation Of An Investment Project, Author Supervision And The Implementation Of Construction Works To Realize The Construction Of A Reinforced Concrete Retaining Wall, The Total Length Of Which Should Be About 50 M, And A New Reinforced Concrete Slab Drain With A Section Of 1.5/1.5. The Newly Built Facilities Will Contribute To The Strengthening Of The Road, Restoration Of The Roadway And Normal Drainage Of Rainwater.The Main Types Of Construction Works That Should Be Carried Out In Connection With The Construction Of The Required Slab Drain And Retaining Wall Are Respectively: Preparatory Works, Including The Introduction Of Temporary Organization And Traffic Safety, Securing The Construction Site; Excavation Works, Including Removal Of The Excavated Material To A Depot Specified By The Contracting Authority; Formwork, Including For The Gutter, Foundation And Body Of The Retaining Wall; Reinforcement Works, Including For The Gutter, The Foundation And The Body Of The Retaining Wall; Concrete Works, Including For The Gutter, Foundation And Body Of The Retaining Wall; Waterproofing - Bituminous Coating For All Elements Of The Gutter And Retaining Wall Subject To Backfilling; Making A Reverse Embankment Behind The Drain And The Wall, Including Delivery/Transport Of The Prescribed In The Investment Project, Loose Materials And Compaction; Restoration Of The Affected Areas/Sections Of The Road.
|