1.1.Reconstruction Of The Suw Building: 1.1.1. Demolition Works, Dismantling And Demolition, 1.1.2. Laying New Floors In The Building, Including Filling The Depression In The Room. Former Boiler Room, 1.1.3. Drying Moisture And Performing Crystalline Injection On External And Internal Walls, 1.1.4. Construction Of A Sanitary Facility Equipped With A Washbasin And A Toilet, 1.1.5. Construction Of A New Electrical Installation Together With The Construction Of A New Power Switchboard With An Outlet To The Generator, 1.1.6.Heating Execution, 1.1.7. Construction Of A New Water And Sewage System, 1.1.8. Installation Of Local Water Heaters, 1.1.9. Construction Of New Mechanical Ventilation, 1.1.10. Renovation Of Internal Walls, New Plasters On The Walls, Painting, 1/1/11. Construction Of New Stations For Water Treatment Technology, 1.1.12. Insulation Of Building Partitions, Floors, Walls And Ceilings, 1.1.13.Foundation Insulation And Insulation, 1.1.14.Replacement Of External And Internal Door Joinery, 1.1.15. Replacement Of Window Joinery, 1.2.Suw Technology 1.2.1. Dismantling Old Technology, 1.2.2. Implementation Of New Technology, 1.2.3. Construction Of A New Purified Water Tank, 1.2.4. Renovation Of The Raw Water Tank, 1.2.5. Renovation Of The Treated Water Tank, 1.2.6. Renovation Of The Washing Tank, 1.2.7. Elimination Of The Old Inter-Site Network, 1.2.8. Construction Of New Inter-Facility Water Supply Pipelines (Supply And Pressure), Sanitary Sewage And Technological Channels Along With Existing Infrastructure (Wells, Gate Valves, Etc.), 1.2.9. Installation Of A New Control Cabinet, 1.2.10.Installation Of A Sewage Treatment Plant For The Needs Of Wwtp, 1.3. Development Around The Wwtp 1.3.1. Dismantling The Old Fence, 1.3.2. Demolition Of Existing Hardening, 1.3.3. Construction Of A New Panel Fence On A Concrete Foundation With An Entrance Gate And A Wicket, 1.3.4. Construction Of Hardening Works, Including: Construction Of Access Roads To The Facilities, Paving Stone Fenders And Access Roads Together With A Maneuvering Area Made Of Asphalt Surface, 1.3.5. Lighting The Square, 1.3.6. Leveling The Area, Sowing Grass, 1.4.Well Renovation1.4.1. Diagnostics Of Deep Wells S2, S3 Bis, S4, 1.4.2. Well Regeneration, Restoring The Proper Functioning Of The Well, 1.4.3. Replacement Of The Fence Of The S2 And S4 Wells, Dimensions: 20X20m,1.4.4. Replacement Of The Well Reconstruction With A Manhole And Ladder On Wells S2, S3 Bis, S4,1.4.5. Lists Electrical Protection On Wells, 1.4.6. Replacement Of Old Deep-Well Pumps With Accessories And Water Meters, 1.4.7. Construction Of New Connections From The Well To The Wwtp, Including Electric, Fiber Optic And Pressure Connections Supplying Water To The Preliminary Tank, 1.5.Deliveries: 1.5.1. Software Delivery And Installation, 1.5.2. Operator Station1.5.3. Delivery Of A Desk With Dimensions 120 X 80 X 60 Cm And A Swivel Chair, 1.5.4. Delivery Of A Table And 3 Iso Chairs, 1.5.5. Kitchenette Consisting Of Standing
|