1) The Subject Of The Order Is: Construction Of A Tourist And Educational Shelter In The Skrzyszów Forestry, Unit 146. The Offer Submitted In The Procedure Must Cover The Entire Scope Of Works Provided For In The Swz And Design Documentation. Investment Location - Construction Of A Shelter In The Skrzyszów Forestry, Unit. 146 In The Lesser Poland Voivodeship, Tarnów County, In The Tarnów Commune.2) The Order Includes The Construction Of A Tourist And Educational Shelter. The Shape Of The Shelter Is Compact, Contained Within The Outline Of A Regular Hexagon. The Shelter Is Made Using Traditional Wooden Technology. Shed With A Built-Up Area Of 34.60 M2. Shed With A Height Of 5.30 M. Axial Spacing Of The Poles - 3.50 M, Diagonal Between The Poles - 7.00 M. Detailed Information Regarding The Order Was Specified In The Construction Design And Technical Specification For The Execution And Acceptance Of The Works. Information Regarding The Order1) The Contractor Of The Works Is Responsible For The Quality Of Their Execution And For Their Compliance With The Design Documentation. Measurement Works For The Needs Of The Works And All Related Costs Are Borne By The Contractor And Should Be Included In The Contract Price.2) The Contractor Is Fully Responsible For Meeting The Quantitative And Qualitative Requirements. Materials Will Be Obtained From Any Source. The Contractor Bears All Costs Related To The Delivery Of Materials To The Construction Site.3) The Contractor Is Obliged To Use Only Equipment That Will Not Adversely Affect The Quality Of The Works Performed.4) Equipment Tailored To The Scope Of Works Should Meet Occupational Health And Safety Requirements.5) All Works Should Be Carried Out In Accordance With Applicable Standards, Construction Practice, Occupational Health And Safety Regulations, Fire Protection Regulations And Environmental Protection Regulations And The Ordering Partys Recommendations.6) The Contractor Will Mark And Secure The Work Sites On Time At His Own Expense. Implementation Of The Works.7) A Detailed Description Of The Subject Of The Order Is Included In Annex No. 4 To The Swz - Design Documentation, Technical Specification For The Execution And Acceptance Of Works, Bill Of Quantities.8) Additional Information Regarding The Implementation Of The Order: The Ordering Party Reserves That There May Be Tonnage Limitations - Appropriate Vehicle Load Capacities Appearing On The Roads To The Planned Investment. The Above Should Be Taken Into Account When Preparing The Offer. Difficulties In This Respect Will Not Constitute A Basis For Changing The Price. The Contractor Is Responsible For Obtaining Appropriate Consent From The Public Roads Manager For The Transport Of Materials And Equipment Needed To Perform The Order. The Transport Of Materials To The Work Site Should Be Carried Out By Means Of Transport Adapted To The Tonnage Specified On The Access Roads To The Work Site. Other Requirements Regarding The Implementation Of The Su
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 118082083
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.