Structural Shell Work – Rekosun, Bp2 - Construction Phase 0 – New Construction Hall, Building F10. Higher-Level Construction Site Facilities Including Traffic Safety Measures 70 M Closed Construction Fence; 80M Open Construction Fence, Construction Site Electricity And Construction Water Connections. Manufacture 72 M2 Of Drilled Beam Shoring With 20 Pieces Of 4.85M Shoring. 800 M3 Of Earthworks / Soil Replacement, Shell Construction Work, In-Situ Concrete; 30M3 Individual And Strip Foundations, 15M3 Floor Slabs, 140M3 Interior And Exterior Walls + Supports, 25M3 Beams With Slopes At The Top, Circumferential Attic Formation, Load-Bearing Roof Surface With Trapezoidal Sheet Metal On Circumferential Support Angles, Shell Construction Work With Earthing And Lightning Protection Performance, 120 M Of Pipes Up To Dn200 Including Pipe Trenches For Drainage, Rainwater, Earthworks And Production Of Tunnel Trenches Including The Shafts
Contact Information
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 117970912
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.