4.1.The Subject Of The Order Is The Performance Of Construction Works As Part Of The Investment Project Titled: Modernization Of The Gymnasium At The Home Army Primary School In Dębowa Kłoda. 4.2.The Scope Of The Order Includes In Particular The Following Works: 4.2.1 Installation Of The Carpet On The Area 524.88 M21) Preparatory And Demolition Works: Preparation Of The Substrate - Protection Of Walls And Windows Against Dust; Disassembly Of The Skirting Board; Sanding Of The Substrate Made Of Wooden Parquet; Dust Removal From The Substrate By Vacuuming The Surface; Repairing Defects In The Substrate After Sanding.2) Installation Of A New Carpet: Laying A Floor Screed Under Carpet Floors; - Sealing The Joints Of The Subfloor; - Cleaning The Subfloor By Vacuuming The Surface; - Laying The Floor With Roll-Up Carpets Intended For Public Utility Facilities - Schools; - Welding Of Rolled Plastic Carpets (Selection Of The Carpet Color Agreed With The Ordering Party); - Installation Of A Plinth Strip; - Cleaning Of The Carpet; - Covering The Carpet With Tape For Painting Pitch Lines; - Painting Of Pitch Lines. Features Of The Offered Carpet Required By The Ordering Party: No.Features1 Carpet Floor Covering For Public Buildings - Schools2 Colors Selected And Agreed With The Ordering Party3 Application Classification 33/43 4 Amortization P1 Or Higher5 Abrasion Class T 6 Anti-Slip Class R10 Or Higher7 Wear Layer 2.0 Mm8 Fire Classification Cfl-S1 9 Indentation Resistance ≤ 0.29 Mm10 Ball Bounce ≥ 90%4.2.2 Renovation Of 2 Sanitary Facilities With An Area Of 30.78 M2:1) Preparatory And Demolition Works: Disassembly Of Old Sanitary Equipment; Forging Steel Door Frames From The Wall; Removing Existing Wall And Floor Cladding; Demolition Of Brick Partition Walls; Removing Uneven Concrete; Dismantling The Old Water And Sewage Installation; Removal And Disposal Of Rubble And Demolition Materials At The Contractors Expense.2) Installation Works: Construction Of Partition Walls From Plasterboards On Single Metal Grates With Double-Sided Coating; Construction Of New Water And Sewage Installations; Installation Of A Central Heating System With Valves And A New Radiator. 3) Finishing And Assembly Works Preparation Of The Surface: Making Self-Leveling Screeds; Priming The Surfaces; Double Painting With Emulsion Paints; Laying Ceramic/Stoneware Tiles On Floors And Walls Along With Grouting And Siliconization; Installation Of Sanitary Equipment: Washbasin, Washbasin Tap, Shower Cabin; White Assembly: Connecting Devices To The Installation And Sealing Them; Installation Of Electrical Equipment (Sockets, Switches, Lighting Fixtures) Adapted To Humid Zones.
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 117939736
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.