The Subject Of The Order Is The Design And Implementation Of A Shuttle Traffic Light Along Zbożowa Street In Wyry, By Preparing A Design For Changing The Permanent Traffic Organization With Traffic Light Programs, And An Executive Design For A Traffic Light Along With An Executive Design For The Construction Of Passing Lanes (Widening The Road To A Minimum Of 5.5 M Along The Length Of The Passing Lanes) For The Purposes Of Creating Waiting Zones For The Green Signal, And Then, Based On Them, Building A Swing Traffic Light With With Passing Places. The Task Should Include The Reconstruction Of The Existing Exit To Property No. 20, So As To Separate The Planned Passing Area - Parking Place From The Entrance To The Property. The Scope Of Design Works Includes In Particular: - Carrying Out Traffic Measurements Necessary For The Proper Design Of Signaling Programs And Capacity Calculations; - Developing Designs For Permanent Traffic Organization For Traffic Lights And Changes In Vertical And Horizontal Markings In Accordance With The Provisions Of The Regulation Of The Minister Of Infrastructure Of July 3 2003 On Detailed Technical Conditions For Road Signs And Signals As Well As Road Traffic Safety Devices And The Conditions For Their Placement On Roads; - Development Of An Executive Design For Traffic Lights - Electrical And Structural Part; - Preparation Of An Executive Design For Widening The Road - Construction Of Passing Passages, Marking The Waiting Zone For The Green Signal And Reconstruction Of The Exit To Property No. Related To The Execution Of The Task; - Obtaining The Necessary Conditions, Opinions And Arrangements For The Design Documentation. The Scope Of Road Works Includes In Particular: - Construction Of 2 Passing Roads By Widening The Road To A Minimum Of 5.5 M For A Length Of Approx. 25 M, Before The Exit To Property No. 20 And Approx. 35 M Within Property No. Design The Extension Structure For The Minimum Category. Kr3; When Designing The Widening Of The Pavement Structure, A Geosynthetic Should Be Used To Connect The Existing Structure With The Designed One, - Reconstruction Of The Exit To Property No. 20, - Installation Of Vertical And Horizontal Markings; - Removal Of Possible Collisions With Underground And Above-Ground Networks; Construction Of Traffic Lights Includes In Particular: - Construction Of A Traffic Light Controller; - Construction Of Cable Ducts; - Foundation Of Masts And Booms; - Installation Of A Cabinet Controller; - Installation Of Signals For Circular Groups; - Installation Of Induction Loops Or Video Detection; - Construction Of A Connection To The Network Supplying The Signaling; - Carrying Out Tests And Measurements; - Activation Of Traffic Lights; - Within 30 Days From The Date Of Activation Of The Signaling, Its Operation Should Be Checked And, If Necessary, Changes Should Be Made To The Program And Control; - The Contractor Will Be Obliged To Connect The Controller To The Monitoring System, Enabling The
Contact Information
Address
Mikołów County Represented By The County Board,Mikołów,43-190,Śląskie,Pl22c - Tyski
Email
kancelaria@mikolowski.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 117939683
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.