R26-66 Wastewater Treatment Plant Outfall Extension Construction . He Squamish River Outfall For The Squamish Wastewater Treatment Plant (Wwtp) Requires Relocation Due To Changing River Channel Conditions, Such That The Existing Outfall Discharge No Longer Receives Good Dilution Conditions, Particularly At Lower River Water Levels. Based On The Feasibility Study Prepared By Greatpacific Consulting Ltd., A More Favourable Location Was Identified Where The River Channel Was Assessed To Be More Stable With More Consistent Access To Good River Flows. To Move The Discharge To The Proposed Location, The Existing Outfall Will Need To Be Extended Approximately 340 M Downstream.
Contact Information
Contact No.
6048925217
Email
info@squamish.ca
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 117828614
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.