|
Tender for Annual Maintenance Of Landscaping Work Of Mini Sectt. Part-I At Sirsa For The Year 2026-27 (Installation Of Submersible Pump At Mini Sectt. Part-I At Sirsa.) , [Hsr 33.7.1.1] [Through Work] - Boring/Drilling Bore Well Of Required Dia For Casing/ Strainer Pipe, By Suitable Method Prescribed In Is: 2800 (Part I), Including Collecting Samples From Different Strata, Preparing And Submitting Strata Chart/ Bore Log, Including Hire & Running Charges Of All Equipments, Tools, Plants & Machineries Required For The Job, All Complete As Per Direction Of Engineer -In-Charge, Beyond 90 Metre & Up To 150 Metre Depth Below Ground Level. All Types Of Soil 300 Mm Dia , [Hsr 33.8.3] [Through Work] - Supplying, Assembling, Lowering And Fixing In Vertical Position In Bore Well, Unplasticised Pvc Medium Well Casing (Cm) Pipe Of Required Dia, Conforming To Is: 12818, Including Required Hire And Labour Charges, Fittings & Accessories Etc. All Complete, For All Depths, As Per Direction Of Engineer -In-Charge. 200 Mm Nominal Size Dia , [Hsr 33.16.3] [Through Work] - Providing And Fixing Suitable Size Threaded Mild Steel Cap Or Spot Welded Plate To The Top Of Bore Well Housing/ Casing Pipe, Removable As Per Requirement, All Complete For Bore Well Of: 200 Mm Dia , [Hsr 33.17.3] [Through Work] - Providing And Fixing M.S. Clamp Of Required Dia To The Top Of Casing/ Housing Pipe Of Tube Well As Per Is: 2800 (Part I), Including Necessary Bolts & Nuts Of Required Size Complete. 200 Mm Clamp , [Hsr 33.18.1] [Through Work] - Providing And Fixing Bail Plug/ Bottom Plug Of Required Dia To The Bottom Of Pipe Assembly Of Tube Well As Per Is:2800 (Part I). 100 Mm Dia , [22.99.3.1] [Through Work] - Providing And Fixing Gun Metal Non- Return Valve Of Approved Quality (Screwed End): 40 Mm Nominal Bore Horizontal , [Hsr 33.19] [Through Work] - Development Of Tube Well In Accordance With Is : 2800 (Part I) And Is: 11189, To Establish Maximum Rate Of Usable Water Yield Without Sand Content (Beyond Permissible Limit), With Required Capacity Air Compressor, Running The Compressor For Required Time Till Well Is Fully Developed, Measuring Yield Of Well By V Notch Method Or Any Other Approved Method, Measuring Static Level & Draw Down Etc. By Step Draw Down Method, Collecting Water Samples & Getting Tested In Approved Laboratory, I/C Disinfection Of Tube Well, All Complete, Including Hire & Labour Charges Of Air Compressor, Tools & Accessories Etc., All As Per Requirement And Direction Of Engineer-In-Charge. , [Ns Item] - Providing 2 Dia Pvc Column Pipe Of Approved Make And Quality, Suitable For 10 Hp Submersible Pump, Conforming To Relevant Is Specifications, Complete In All Respects. , [Ns Item] - Supply And Lowering Isi Mark 10 Hp Three Phase Submersible Motor With Pump Of Kirloskar, Lubi, Ksb, Crompton, Texmo Etc (Along With Nylon Rope) Complete In All Respect. , [Ns Item] - Providing, Laying, Testing And Commissioning Of 3 Core X 10 Sq.Mm Copper Conductor Pvc Insulated And Pvc Sheathed Flat Submersible Cable, Suitable For 10 Hp, 3 Phase Submersible Pumping Set, Of Approved Make Of Brands Like Finolex, Polycab, Havells Etc. Complete In All Respect. , [Ns Item] - Supply Isi Mark Panel Board Of 10 Hp Of Bch/Cuttler Hammer/L&T/Boparai Make. (As Per Analysis)
|