|
Bids Are invited for Custom Bid For Services - Cleaning Disposal Of Strom Water Drainage System Inside Smelter Plant For 2026-2028 - Cleaning Of Silt, Slush, Earth, Debris, Grasses / Bushes Etc. From Open Pucca Drains And Stacking Of The Same Within 50 Mtr Lead By Manual / Mechanical Means Including All Tools, Tackles, Labours Etc. All Complete As Per The Specification And Direction Of The Eic Including Removal & Refixing Of Drain Covers If Any. (Rectangular Section Width Up To 500Mm And Depth Variable.) , Cleaning Of Silt, Slush, Earth, Debris, Grasses / Bushes Etc. From Open Pucca Drains And Stacking Of The Same Within 50 Mtr Lead By Manual / Mechanical Means Including All Tools, Tackles, Labours Etc. All Complete As Per The Specification And Direction Of The Eic Including Removal & Refixing Of Drain Covers If Any. (Rectangular Section Width 501Mm To 750Mm And Depth Variable.) , Cleaning Of Silt, Slush, Earth,Debris, Grasses / Bushes Etc. From Open Pucca Drains And Stacking Of The Same Within 50 Mtr Lead By Manual / Mechanical Means Including All Tools, Tackles, Labours Etc. All Complete As Per The Specification And Direction Of The Eic Including Removal & Refixing Of Drain Covers If Any. (Rectangular Section Width 751 And Above With Depth Variable.) , Cleaning Of Silt, Slush, Earth,Debris, Grasses / Bushes Etc. From Open Pucca Drains And Stacking Of The Same Within 50 Mtr Lead By Manual / Mechanical Means Including All Tools, Tackles, Labours Etc. All Complete As Per The Specification And Direction Of The Eic Including Removal & Refixing Of Drain Covers If Any. (Trapezoidal Drain Bottom Width 300 To 950Mm, Top Width And Height Variable.) , Cleaning Of Silt, Slush, Earth, Debris Etc. From Storm Water Rcc Pipe 230 Mm To 450Mm Dia Culverts And Stacking / Disposal Of The Same Within 50 Mtr Lead By Manual/ Mechanical Menas Including All Tools, Tackles, Labours Etc. All Complete As Per The Specification And Direction Of Eic. , Cleaning Of Silt, Slush, Earth, Debris Etc. From Storm Water Rcc Pipe 500Mm To 800Mm Dia Culverts And Stacking / Disposal Of The Same Within 50 Mtr Lead By Manual/ Mechanical Menas Including All Tools, Tackles, Labours Etc. All Complete As Per The Specification And Direction Of Eic , Cleaning Of Silt, Slush, Earth, Debris Etc. From Storm Water Rcc Pipe 850Mm To 1200Mm Dia Culverts And Stacking / Disposal Of The Same Within 50 Mtr Lead By Manual/ Mechanical Menas Including All Tools, Tackles, Labours Etc. All Complete As Per The Specification And Direction Of Eic. , Cleaning Of Silt, Slush, Earth, Debris And Grasses/Bushes Etc. From Storm Water Rcc Box Culverts And Stacking Of The Same By Manual / Mechanical Means Within 50 Mtr Lead Inside The Smelter Plant Including All Tools, Tackles, Labours Etc. All Complete As Per The Specifications And Direction Of Eic. , Cleaning Of Silt, Slush, Earth, Debris, Grasses/Bushes And Gunny Bags Etc. From Storm Water Catch Basin Including Stacking Of The Same Within 50 Mtr Lead Inside The Smelter Plant Including All Tools, Tackles, Labours Etc. All Complete As Per The Specifications And Direction Of Eic. , Cleaning Of Silt, Slush, Earth, Debris, Grasses/Bushes And Gunny Bags Etc. From Storm Water Catch Basin Including Stacking Of The Same Within 50 Mtr Lead Inside The Smelter Plant Including All Tools, Tackles, Labours Etc. All Complete As Per The Specifications And Direction Of Eic. , Surface Dressing Of The Ground In All Kinds Of Soil Including Cutting, Filling And Removing Of Vegetation/Debris And In Equalities Not Exceeding 30Cm Deep & Disposal Of The Debris/Earth Within 50 Mtr Lead By Manual / Mechanical Means, Dressed And Levelled As Per Specification And Direction Of Eic For All Drains. , Disposal Of Drain Cleaned Debris, Slush, Heap Of Earth, Heap Of Debris And Dismantling Materials From Various Units And Buildings Of Smelter Plant Beyond 1Km And Up To 3 Km From The Loading Point Including Cutting, Loading, Unloading By Manual / Mechanical Transport Within Plant All Complete As Per The Specifications And Direction Of The Eic. (Mode Of Measurement Will Be Followed As Mentioned In Special Condition Of Contract) , Cleaning Of Boundary Jalli Including Removal Of Vegetation Slushy Soil, Garbage, Loose Boulder, Bags, Polythenes, Grass, Construction Rubbishes, Earth Etc. Disposal And Levelling Of Materials In The Low Laying Area With 100M Lead Etc. All Complete As Per The Specification & Directions Of The Eic. , Cleaning And Lifting Of Rejected Anode, Butts From Storm Water Drain By Mechanical Mean (Hydra) Carefully And Stacking The Same Within 100M Lead As Per Direction Of Eic. , Cleaning Of Floors, Road Berms, Adjoining Area On Both Side Of Drain, Rcc Roof Tops At All Level In Smelter Plant Including Collection Of Wooden, Steel & Scrap Materials & Stacking Of Debris, Chipping Of Floors If Required, Bagging Of Sand And Earth Up To 100Mm Depth & Final Disposal Beyond A Lead Of 100Mtr As Per The Direction Of Eic. (Measurement Will Be Taken On The Basis Of Area Cleaned)
|