|
Bids Are invited for Biosafety Cabinet - Biosafety Cabinet Should Be Of Class Ii, Type A2 With Approx. 30% Exhaust And 70% Recirculation Air-Flow Specifically Required For Use In Biological Applications , Cabinet Should Have Internal Dimension (Wxdxh) Approximately 3*2.5*7Ft. , Cabinet Height Should Not Exceed More Than 7 Feet. , Cabinet Construction: , Filters: , Should Have Microprocessor Controlled And Digital Display With Stable Airflow And Automatic Adjustment Of Blower Speed For Compensation Against Filter Choking, Filter Life Display, Blower Hour Meter ,Uv Hr Meter , Alarms Etc. On Lcd Display. , Should Be Noiseless Front Openging Of The Cabinet And It Should Be Angled So As To Help Minimize Glare On Window To The User. , Should Have Integrated Armrests That Are Raised Above The Work Surface To Help Prevent The Users Arms From Blocking The Front Air Inflow, Thereby Maintaining Proper Airflow And Containment. , Should Have Smooth (Noiseless) Sash Operation Manually With Gaskets All Around The Sash. , Should Have Uv Light For Decontamination With On/Off Timer. , Should Be Certified To Nsf 49 Or En12469 (Certification To Be Enclosed). , Ulpa Filters Should Be En-1822 Certified. , Cabinet Should Be Supplied With Support Floor-Stand With Locking Caster Wheels. , Should Have Built In 6A And 16A Electrical Socket. , Internal Fluorescent Lighting Fixture Should Be Such That Light Should Not Be Facing The User And It Should Be Out Of The Air Stream. , All Internal Wall Of Working Chamber Should Be Single Piece Ss 304 Including Side Wall With Rounded Corner. , Cabinet Should Produce Low Sound Less Than 60Dba , Virus Burn Out Unit With Ducting: , Vendor Shall Perform Validation Of Biosafety Cabinet Under Warranty And Cmc At Half Yearly Intervals As Per Nabl 112 Guidelines.It Includes Tests - Differential Pressure Test,Particle Count Test, Air Flow Velocity Test And Hepa Filter Integrity Test. All Validation Activities Shall Be Carried Out By Nabl-Accredited/Certified Laboratory And Vendor Shall Submit Nabl Accredited/Certified Test Reports And Traceability Certificate, Ensuring That The Nabl Logo Appears On Both The Main Test Certificate And The Traceability/Calibration Certificate. Same Validation Is Mandatory After Replacement Of The Filters. Faulty Filters To Be Taken Out Of Tmh Premised By The Vendor During Warranty And Cmc Period. , Should Perform Preventive Maintenance (2Nos) During Warranty,Amc,Cmc & If Entered Into Amc(Includes Unlimited Breakdown Calls) /Cmc (Which Will Include Spare Replacement, Breakdown Calls). Vendor To Submit Sops For Pms At The Time Of Installation/ Commissioning. This Is Mandatory Requirement. , Performance Certificates Of Iq,Oq,Pq Tests To Be Submitted At The Time Of Installation/Commissioning. , Vendor To Submit The Technical Data Sheet, Brochure Etc As A Tender Document With Reference To The Quoted Make & Model. Please Mention The Reference Page No., Etc In These Documents Against Each Technical Specifications In The Compliance. , Vendor To Submit List Of Consumables/Consumable Spares( I.E.Spares Need To Be Replaced At Regular Intervals, Maybe Quarterly/Half Yearly/Yearly Etc.) If Any.Cost Of Consumables To Be Given By The Vendor In Financial Bid. , Please Submit Pre Installation Requirements [Electrical, Hvac, Compressed Air Along With Air Pressure Mentioned), Water Requirement (Ro/Di/Distilled Water With Its Pressure, Flow Rate Per Hour) ; If Any Of The Above Is Essential] , Vendor To Provide Ups With Adequate Capacity, If Required For The Quoted Equipment. If Not Required, Vendor To Mention The Same. , Vendor To Submit Details Of Footprint Size & Weight Of The Quoted Model. , Vendor To Submit Power Consumption. , Demo Of The Quoted Model , Will Be Required If So Desired By The User, After The Opening Of The Technical Bid And Prior To Opening Of Financial Bid. This Is For Technical Evaluation. All Technical Specifications Mentioned Above To Be Mandatorily Shown In The Demo Unit. , Users/Installation List: A List Of Installations Of The Quoted Model With The Address And Contact Numbers To Be Provided. , Predispatch Inspection At Factory Will Be Required If Desired By Authorities. , Should Be Ce/Us Fda/Bis/Icmed Approved.( In The Case Of Ce Certificate, The Vendor Must Submit The Declaration Of Conformity) , Vendor Should Provide The User Manual And Service Manual Copy During The Installation Of The Equipment. , Unpacking And Shifting The Consignment To The Installation Site Is To Be Included In The Vendors Scope Of Supply. Bidder/Manufacturer/Authorized Service Provider Should Take Responsibility To Lift /Shift The Consignment From Unloading Site To The Installation Site. Unloading Site Shall Be Stores Department, Tata Memorial Hospital,Parel. If Needed ,Bidder Has To Arrange For The Labours At No Charge To Tata Memorial Hospital,Parel.. (Before Submitting The Quotation,Bidders May Visit Tata Memorial Hospital,Parel. To Know Unloading And Installation Site. , Training: , Local Service Support: Should Have Local Office And Service Support/Service Engineer For Attending The Breakdown Calls. Details To Be Submitted. , Response Time: Should Not Be More Than 06 Hrs From Lodging A Breakdown Complaint On Toll Free Or By Email. , Warranty- 2 Years , Cmc- Cost Per Annum Will Be Considered For All Bidders For 8 Years After Warranty , Back To Back Assurance To Be Taken By The Supplier From Oem To Supply Spares For Minimum 10 Years And To Be Submitted. , If 2 Years Warranty, Cmc Per Annum For 8 Years After Warranty And Buyback If Any Wherever Applicable Are Not Adhered To, Tmc Reserves Right To Reject The Offer. , Please Mention Whether Ups Is Required For The Equipment. If So Should Be Included In The Offer. , Only Yes Or No Should Be Mentioned In Compliance Report And Additional Information In Remarks Column. , Please Provide List Of The Consumables/Spares/Reagents/Control/Calibrators (If Any) In Technical Documents And Cost Of The Same Should Be Uploaded In Pdf File In The Financial Documents. , Do Not Mention / Upload Price And Cost In The Technical Documents Otherwise Your Quotation Will Be Disqualified At Technical Stage.
|