Construction Work – Untervaz, Turnout 51, Master Builder Work. The Rhb Will Be Implementing Various Offering Steps In The Coming Years With The Retica 30 And Retica 30+ Offering Concepts. For The New Hourly Re Connection Landquart - Chur, The Re Must Be Accelerated On The Landquart - Chur Section. With The Acceleration Of The Untervaz - Chur Section From Todays V = 100 Km/H To The New V = 110 / 120 Km/H, The Tense Driving Situation Of The Re Is Intended To Be Relaxed. In Addition To The Replacement Of Switch 51 In Untervaz And Geometric Adjustments In The Switch Area, Adjustments To Sa Systems, Cable Systems, Contact Lines And Low-Voltage Systems Are Also Required. The Substructure Must Also Be Renovated In The Switch Area And Drainage Created. The Contract Includes The Construction And Expansion Of The Substructure Up To And Including Pre-Ballast, Including Drainage, As Well As The Construction Of The Civil Engineering Work For Cable, Safety And Contact Line Systems.
Contact Information
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 117776667
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.