1. The Subject Of The Order Is The Implementation Of The Task Titled: Construction Of A System For Discharging Rinsing Water From The Water Treatment Plant At Ul. Dworcowa In Panki.2.The Scope Of The Order Includes The Construction Of A Complete System For Discharging Rinsing Water From The Suw Area To The Existing Sanitary Sewage System, In Particular: 1) Construction Of An Underground Rinsing Water Tank With A Capacity Of 10 M³; 2) Construction Of A P1 Pumping Station Equipped With Two Submersible Pumps Working Alternately In The Primary-Reserve System; 3) Construction Of A Measuring Well With An Electromagnetic Flowmeter; 4) Construction Of A Pe100 Rc Pressure Pipeline Ø90 Mm With A Length Of Approximately 816 M;5) Construction Of Pvc-U Gravity Pipes Ø200 Mm With A Total Length Of Approximately 22 M;6) Construction Of Sewage Wells, Expansion Wells And The Necessary Fittings;7) Construction Of Trenchless Passages Under Roads And Railway Line No. 181 Herby Nowe–Olesnica;8) Construction Of Electrical Power Supply, Control Cabinet, Grounding Installation And Automation;9) Switching On Pumping Station To The Operators Existing Monitoring And Visualization System;10) Carrying Out Earthworks, Drainage Of Excavations, Restoring Road Surfaces And Land Development;11) Carrying Out Tightness Tests, Pressure Tests, Electrical Measurements, Commissioning And Staff Training;3.The Contractors Obligations Include In Particular: 1) Performance Of All Obligations Arising From The Decisions, Conditions And Arrangements Of Infrastructure Managers, In Particular: Pkp Polskie Linie Kolejowe S.A., Pkp S.A., Pkp Telkol Sp. Z O. O. Tk Telekom Sp. Z O. O., Pge Energetyka Kolejowa S.A. And Road Managers, The Panki-Przystajń Intermunicipal Association For Water Protection, Tauron Dystrybucja S.A.;2) Preparing Documents And Ensuring That The Ordering Party Concludes The Required Agreements Regarding The Temporary Use Of Railway Properties,3) Obtaining Consent To Enter The Railway Area And Making All Required Notifications Before The Commencement Of Works,4) Developing And Agreeing On The Required Regulations And Schedules For Carrying Out Works, Documentation Regarding The Organization Of Works And Other Studies Required By Railway Infrastructure Managers;5) Making Required Notifications, Ensuring Paid Railway And Industry Supervision, Confirming The Location Of Existing Cables And Devices, Securing Them And Restoring The Railway Area After The Completion Of The Works; 6) Obtaining Permits From Road Managers To Occupy The Road Lane, Developing And Approving The Required Traffic Organization, Paying The Required Fees And Restoring The Road Lane In Accordance With The Conditions Of The Relevant Road Manager, 7) Providing Comprehensive Surveying Services For The Investment, Including Marking Out Facilities, Networks And Devices In The Field, Carrying Out Control Measurements During The Works, Surveying Inspection Of The Passage Under The Railway Line And Preparation Of A Pos
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 117769336
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.