Tenders Are Invited For Task No. 3: Construction Of Area Lighting With Monitoring, As Part Of The Task Const ... in Poland
Tender Notice
TenderID
117769333
Tender Brief
Tenders Are Invited For Task No. 3: Construction Of Area Lighting With Monitoring, As Part Of The Task Construction Of A Park In The Gaj Estate At Ul. Juliusza Słowackiego
The Subject Of The Investment Is The Construction Of Area Lighting And Monitoring In The Newly Built Park At Ul. Słowackiego In Boguchwał. The Scope Of The Order Is Part Of A Broader Investment Project Involving The Construction Of A Park And Includes The Construction Of An External Area Lighting And Monitoring Installation On Plot No. 531/529, Plot No. 0001 Boguchwała. Task No. 3: Construction Of Area Lighting With Monitoring Includes The Construction Of External Electrical Installations, Including Area Lighting And Video Monitoring Installations With Power Supply, Lighting Control Cabinet, Monitoring Distribution Cabinet In The Recreational Area In Boguchwała. Construction Of Park Lighting Includes Poles In Two Heights: - Park Poles For Lighting Alleys And Paths, 6 M High, With A Boom And Led Luminaires 49 Pcs., Lighting Of The Pitch And Bicycle Track - 9 Pcs. Of 9.8 M High Poles With Led Lighting Fixtures. Area Monitoring Includes 16 Cameras, Telecommunications Cable Ducting (12 Sk-1 Wells), Distribution Cabinet. The Detailed Scope Of Task No. 3 Includes The Technical Design And Construction Design Entitled Construction Of A Lighting And Monitoring Installation For The Area On Plot No. 531/529 In Boguchwala. A Detailed Description Of The Subject Of The Order Is Specified In The Attached To The Swz: Construction Design, Technical Design, Stwiorb And Bill Of Quantities. During The Construction Of The Park As Part Of The Investment, The Tree Protection Standards Should Be Applied In Terms Of Protection Against Damage To The Roots, Trunks And Crowns Of Existing Trees By Fencing The Tree Protection Zone With A Temporary One. Fence With A Minimum Height Of 1.5 M. Particular Attention Should Be Paid To The Security And Protection Of Greenery Both During Preparatory Works And Construction Works. The Contractor Will Be Obliged To Implement The Subject Of The Contract In Accordance With The Architectural Standard Included In The Accessibility Standards For Cohesion Policy 2021-2027 To The Extent Described In The Swz And The Order Documentation. The Contractor Will Be Obliged To Manage Waste On The Site Construction According To Specific Rules That Aim To Minimize The Impact On The Environment And Comply With Applicable Legal Regulations. This Process Should Be Divided Into Several Key Stages: - Identification And Classification Of Waste - Waste Segregation - Transfer Of Waste To Recipients - Recycling And Disposal - Documentation And Reporting - Waste Minimization. Topsoil Stored For Later Use
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 117769333
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.