|
1. The Subject Of The Order Is Renovation Of The Third Party Liability Equipment Warehouse As Part Of The Civil Protection And Civil Defense Program For 2025-2026.2.The Subject Of The Order Is Implemented Under The Agreement No. 77.7.2/2026 Of July 2, 2026 With The Voivode Of Lublin Regarding The Granting Of A Targeted Subsidy From The State Budget In 2026 To Co-Finance Current Own Tasks Under The Civil Protection And Civil Defense Program For The Years 2025-2026. 3. The Investment Will Be Carried Out On The Plot With Registration Number 136, Północ District, Located At Ul. Matejki 1 In Kraśnik. 4. The Subject Of The Order Includes In Particular: 1) Preparatory And Security Works, 2) Demolition Works, 3) Earthworks, 4) Moisture-Proof Insulation Of External Walls, 5) Insulation Of External Walls With Xps Boards, 6) Implementation Of Protective Insulation, 7) Installation Of Pvc Pipes, 8) Backfilling And Compaction Of Excavations, 9) Reconstruction Of The Paving Stone Surface, 10) Installation Of Concrete Edges, 11) Renovation Of Internal Electrical Installations Oc Warehouse Rooms,12) Installation Of The Rm Warehouse Switchgear, 13) Installation Of Power Supply For The Warehouse Along With A Power Supply Point From A 5 Kw Mobile Generator,14) Installation Of Autonomous Emergency And Evacuation Lighting With Automatic Testing Function.15) Bathroom Renovation,16) Brickwork,17) Plastering Works,18) Plastering,19) Installation Of Moisture-Proof Floor Insulation,20) Installation Of Tile Cladding Stoneware,21) Construction Of Plinths,22) Painting Works,23) Installation Of Door Joinery,24) Water And Sewage Works,25) Installation Of Sanitary Equipment,26) Installation Of Ventilation Grilles,27) Works Related To The Central Heating Installation,28) Installation Of Radiators,29) Repair Of The Plaster Coating Of Central Heating Pipes,30) Tidying Up The Area And Rooms.5.The Order Will Be Carried Out In An Active Facility - A Fully Functioning Kindergarten On The Above-Ground Floors Of The Building. Construction Works Require Special Caution In Carrying Out The Work, In Particular The Use Of Appropriate Safeguards And Shields To Enable The Operation Of The Facility And To Keep The Work Area In Good Order. The Contractor Is Obliged To Carry Out The Works In Such A Way As Not To Disturb The Operation Of The Facility And To Ensure The Safety Of Third Parties. During The Period Of Execution Of The Order In An Active Facility, Safe Access To The Building For Employees, Parents, Guardians And Children As Well As Continuity Of Utility Supply Must Be Ensured. Any Necessary Media Shutdowns Should Be Agreed On An Ongoing Basis With The Kindergarten Director. Noisy And Disruptive Works Should Be Carried Out After Prior Consultation With The Kindergarten Director. You Should Take Into Account The Need To Perform Particularly Strenuous Work In The Afternoon And Evening And On Days Off From The Kindergarten.6.The Order Should Be Performed In Particular In Accordance With Th
|