|
The Subject Of The Order Is The Performance Of Construction Works As Part Of The Task Titled: Construction Of A Branch Of The Municipal Center Of Culture, Sports And Promotion Together With A Branch Of The Library In Toporzysko, On Plot No. 24/13 In Toporzysko. The Scope Of The Order Includes The Comprehensive Construction Of A Free-Standing, Single-Story Public Building, Including Earthworks, Foundations, Construction And Finishing Works, Installation Of Joinery And Joinery, And Execution Of The Following Installations: Water And Sewage, Central Heating Heating, Gas, Mechanical Ventilation, Air Conditioning, Electric, Lightning Protection, Photovoltaic And Telecommunications. The Order Also Includes Land Development, Including Access Roads, Access Roads, Parking Spaces, Hardened Surfaces, Drainage, Sewage, Tanks, Drainage, Fencing, Small Architecture, Greenery And Lpg Tank. Attention! The Contractor Is Obliged To Transport Excess Soil, Excavated Material And Earth Masses Generated During The Implementation Of The Works To The Place Indicated By The Ordering Party. The Offer Price Must Include All Costs Related To Loading, Transport And Unloading. The Detailed Scope Is Specified In: Design Documentation With Errata - Constituting Annex No. Equivalence), Technical Specifications For The Execution And Acceptance Of Works (Stwiorb) - Constituting Annex No. 11 To The Swz, Bills Of Quantities - Annex No. 9 To The Swz. The Attached Bills Of Quantities Are Of An Auxiliary And Illustrative Nature. In The Event Of Discrepancies Between The Bills Of Quantities And The Design Documentation And Stwiorb, The Design Documentation And Stwiorb Shall Prevail. Errata To The Design Documentation Also Constitute An Integral Part Of The Design Documentation, Containing Clarification Of The Provisions Regarding The Admission Of Equivalent Solutions And The Criteria For Assessing Equivalence. Any References To Standards, Certificates, Attestations, Approvals, Systems, Types, Proper Names Or Technical Solutions Should Be Interpreted Taking Into Account These Errata And The Provisions Of The Public Procurement Law. To The Extent That The Implementation Of The Subject Of The Order Includes The Use Of Ict Products, Ict Services Or Ict Processes, The Contractor Is Obliged To Ensure Their Compliance With The Requirements Arising From The Act Of July 5, 2018 On The National Cybersecurity System.4.Equivalence. 1. All Proper Names, Manufacturers Names, Types, Models, Catalog Numbers, Trademarks, Patents, Origins, Standards, Technical Approvals, National Or European Technical Assessments, Certificates, Attestations, Approval Certificates, Labels, Technical Specifications Or Other Technical Reference Systems Indicated In The Design Documentation, Errata, Bills Of Quantities, Cost Estimates, Stwiorb, Drawings, Descriptions And Summaries Should Be Treated As Examples And References.2.Each Such Indication Shall Be Accompanied By The Words Or Equivalent Or Or Equivalent, As Appropria
|