1. The Subject Of The Order Is The Implementation Of An Investment Task Entitled: Reconstruction Of The Access Road To Agricultural Land In Góra.2. The Investment Is Located In Góra, In The Sieraków Commune.3. The Subject Of The Order Includes The Reconstruction Of The Access Road To Agricultural Land On A 502.03 M Long Section, Along With The Performance Of All Construction, Road, Earthwork, Demolition, Finishing And Accompanying Works Resulting From The Technical Documentation.4. Brief Description Of The Scope Of Works: The Scope Of The Order Includes In Particular: A) Execution Of Preparatory And Measurement Works, Including Marking Out The Designed Elements; B) Performance Of Demolition Works, In Particular: • Demolition Of The Existing Bituminous Surface With The Sub-Base, • Demolition Of The Existing Paving Stone Surface With The Sub-Base, • Demolition Of The Existing Curbs And Edges Together With The Footings, • Loading, Transport And Development Materials From Demolition;C) Execution Of Earthworks, Including Excavations, Loading, Transport And Management Of Excess Soil;D) Mechanical Profiling And Compaction Of The Subgrade For The Designed Surfaces;E) Construction Of A Road With A Bituminous Surface, Generally 4.00 M Wide, With A Structure Including: • A Wearing Course Of Ac 11S Asphalt Concrete, 5 Cm Thick, • A Base Base Made Of An Unbound Mixture - Crushed Aggregate 0/31.5 Mm, 15 Cm Thick; F) Construction Of Roadsides Made Of Crushed Aggregate 0/31.5 Mm; G) Construction And Renovation Of Exits Located Within The Road, Including Exits With A Surface Made Of Crushed Aggregate And, To The Extent Specified In The Technical Documentation, A Surface Made Of Concrete Cubes; H) Construction Of A Pedestrian Route Made Of Concrete Cubes With The Required Construction Layers; I) Construction Of Street Elements, Including: • Concrete Edges, • Concrete Retainers, • Concrete Curbs, Along With Concrete Footings;J) Execution Of Surface Drainage Of The Road By Appropriate Shaping Of Transverse And Longitudinal Slopes Of The Road, Enabling Drainage Of Rainwater To Green Areas;K) Execution Of Elements Of Target Traffic Organization, Including: • Installation Of Vertical Markings, • Installation Of Horizontal Markings, • Construction Of A Pedestrian Crossing At The Intersection With The Road District Level;L) Carrying Out Height Adjustments Of Existing Elements Of Technical Infrastructure Located In The Area Of The Works Being Carried Out;M) Carrying Out Works Related To Shaping Green Areas, Including Planting The Ground Surface;N) Carrying Out A Post-Construction Geodetic Inventory;O) Carrying Out All Auxiliary, Preparatory, Security, Cleaning And Reconstruction Works Necessary For The Proper Execution Of The Subject Of The Order And Putting The Completed Facility Into Use In Accordance With Its Intended Purpose.5. Documentation Specifying The Subject Of The Contract1.The Detailed Scope Of The Subject Of The Order, Design Solutions, Technical, Material An
|