|
Part I – Reconstruction Of Playgrounds At Ul. R. Menerka, S. Żeromski, Axis. Zabajka In Głogów Małopolskithe Scope Of The Investment Includes The Reconstruction Of The Following Playgrounds, I.E.: A) Playground At Ul. Axle Sleeves. Niwathe Subject Of The Order Is The Demolition And Construction Of Small Architectural Structures With Accompanying Infrastructure On The Playground Located On Plot No. 3297 In Głogów Małopolski At Ul. R. Menerki. The Scope Of The Order Includes: – Demolition Of Existing Small Architecture Objects, I.E. A Rocker, A Wooden Swing, A Sandbox And Old Benches And Garbage Bins, – Construction Of Small Architectural Objects In Order To Equip The Playground With New Objects, I.E.: A Rocker, Swings, A Set With A Slide, An Educational House, Educational Games, A Set With A Sandbox, Benches, Waste Bins, – Renovation Of Existing And Usable Structures. Facilities: Cleaning And Painting Other Existing Equipment, - Construction Of Safe Surfaces Made Of Grass And Sand. B) Playground At Ul. Żeromskiego The Subject Of The Order Is The Demolition And Construction Of Small Architectural Structures On A Playground Located On Plot No. 942 In Głogów Małopolski At Ul. S. Żeromskiego. The Scope Of The Order Includes: – Removal Of The Damaged Device - A Rocker, – Removal Of Waste Bins, – Retrofitting The Playground With: Rockers, A Scale Swing, An Educational House, Educational Games, A Set With A Slide, A Movable Bridge In Accordance With The Outline Of Safety Zones, – Making A Sand Surface Under The Set, – Cleaning And Painting The Remaining Existing Devices, – Placing Additional Benches (4 Pcs.) And Waste Bins (2 Pcs.), – Construction Of A Fence For The Playground With A Gate. C) Playground On An Axle. Zabajka The Subject Of The Order Is The Retrofitting Of An Existing Playground By The Construction Of Small Architectural Structures On The Plot No. 109/8 In Głogów Małopolski In The Zabajka Housing Estate. The Scope Of The Order Includes: - Construction Of A Safe Surface (Measuring Works, Topsoil Removal, Earthworks, Construction Of A Drainage Layer, Concrete Footings And Edges, Crushed Aggregate Foundation, Sbr Rubber Underlay With 6 Cm Thick, Epdm Surface 0.8 - 1.0 Cm Thick) - Retrofitting The Playground With A Rope Pyramid With A Height Of 4.7 M And External Dimensions Of 6.6 M X 5.7 M. Note: Regardless Of The Provisions Of The Bill Of Quantities, The Contractor Will Develop, Produce And Install At The Entrances To The Investment Area 2 Pieces Of Signs With A Schematic Layout Of The Facility (Based On The Land Development) Braille. In Addition, The Contractor Will Present In Writing The Separate Cost Of Carrying Out These Works During Implementation (The Data In Question Will Be Used For Monitoring Purposes).
|