|
1. Name Of The Order: Improving The Quality Of Tourist Resources Of The Pilica River Valley Through The Development Of Recreational And Recreation Infrastructure In Tomaszów Mazowiecki - Stage Ii.2.The Order Involves The Implementation Of An Investment Whose Subject Is The Task Entitled: Improving The Quality Of Tourist Resources Of The Pilica River Valley Through The Development Of Recreational And Recreation Infrastructure In Tomaszów Mazowiecki - Stage Ii, As Part Of The Regional Program European Funds For Łódź 2021-2027.3.The Order Will Be Implemented In The Design And Build Mode On The Basis Of The Functional And Utility Program (Ffu), Therefore The Elements Not Described In The Functional And Utility Program (Ffu) And Necessary Due To The Function Of The Facility, Technical Conditions, Legal Regulations, Including Safety And Fire Protection, Etc. Must Be Taken Into Account Both By The Designer At The Design Stage And The Contractor At The Execution Stage.4) As Part Of The Planned Comprehensive Investment, Development Is Planned. So-Called Recreational Areas Marina On The Pilica River Located At Pck Street, In Accordance With The Following Scope: A) Construction Of A Hanging Pedestrian And Bicycle Footbridge Over The Pilica River, Approximately 3.5 M Wide And Approximately 50 M Long, With A Connection In The Form Of A Pedestrian And Bicycle Route With The Pilica River Open-Air Museum Located On The Opposite Bank Of The River, B) Modernization Of The Internal Building Intended For Tourist And Administration Services (Installations, Finishing, Equipment, Adaptation To Applicable Regulations), C) Demolition Of The Sanitary Building, D) Construction Of A New Sanitary Building, Analogous To Stage I, E) Demolition Of Summer Buildings (Camping Houses), F) Construction Of New Year-Round Summer Buildings And Construction Of New Year-Round Ones, Based On Modular Ready-Made Products, G) Modernization Of The Internal Complex Of Summer Buildings Together With The Reconstruction Of The Gas Boiler Room, As Well As Adapting Them To A Year-Round Function, H) Construction Garden Shelter, Based On Ready-Made Products With An Energy Connection, I) Construction Of A Place For A Bonfire, Based On Ready-Made Products, J) Construction Of Camping Sites Equipped With Energy And Water And Sewage Installations, (Caravanning Zone), K) Construction Of Technical Infrastructure, Video Monitoring, Power Grid, Water Supply, Sewage System, Area Lighting, L) Construction Of A Photovoltaic Farm To Power The Facility, M) Reconstruction And Construction Of New Pedestrian Routes And Pedestrians And Vehicles, In Relation To Those Designed In Stage I, N) Inventory Of Green Areas And A Tree Cutting Project Along With The Development And Arrangement Of Green Areas, O) Construction Of Small Architecture Elements, In Relation To Those Designed In Stage I, P) List Of Facility Equipment, In Relation To Those Designed In Stage I. Changes In Land Development Will Consist In The Reconstructi
|