|
Operation Titled Replacement Of The Roof Covering Of The Building Located At Ul. Rynek 12 In Sułowo Description Of The Subject Of The Orderreplacement Of The Roof Covering Of The Building Located At Ul. Rynek 12 In Sułów, Plot 104/1, Sułów District, Milicz Commune. Scope Of Works To Be Performed: The Subject Of The Task Is The Performance Of Construction Works Consisting In Replacing The Roof Covering Of The Building Located At Ul. Rynek 12 In Sułów, Including Rebuilding Chimneys Above The Roof, Replacing Gutters, Downpipes And Lightning Protection Installation. The Renovation Works Include: • Demolition Works: - Fencing And Securing The Area Around The Facility, - Securing Window And Door Openings By Covering Tapes, Polyethylene Foils And Soft Fiberboards, Cut To The Shape Of The Windows - Dismantling The Old Roof Covering: Roof Tiles, Downpipes, Gutters, Chimney Flashings, Eaves, Snow Protection, - Demolition Of The Covering From Roofing Felt, - Construction Of Scaffolding At Chimneys, Dismantling Of Chimneys And Removal Of Rubble From The Roof, - Transport And Disposal Of Demolition Waste, • In Terms Of Wooden Structure: - Strengthening Of Rafters, - Replacement Of Walls, Foundations, Ordinary Rafters And Clamps, - Dismantling Of Existing Roof Windows, Roof Hatch And Reassembly With Construction Of The Supporting Structure, • In Terms Of New Covering: - Roof Tiles - Ceramic Plain Tiles Brick-Colored, - Laying Battens And Roof Membrane Foil, - Titanium-Zinc Sheet Metal Flashings, - Making A Ridge And Ridge In The Roof, Installing A Ridge Tile Connector, - Installing A Sanitary Installation Vent, - Installing An Antenna Cap, - Installing Roof Hatches In The Roof Slope, - Installing Roof Gutters, Downpipes, - Two-Layer Covering With Underlay Felt And Roofing Felt. Top Covering, - Re-Building Of Chimneys Made Of Natural Red Clinker Bricks Above The Roof, - Impregnation Of The Wooden Roof Structure, • In The Scope Of The Lightning Protection Installation: - Disassembly Of The Lightning Protection Installation Spacing Brackets, Equalizing And Lightning Conductors Made Of Cable, - Installation Of Horizontal Strips Of The Lightning Protection Installation, - Installation Of Connectors For The Eaves Gutter, - Replacement Of The Lightning Protection Installation Conductors And Equalization Conductors In The Vertical Line On The Walls In Advance Installed Brackets, - First And Subsequent Measurement Of The Lightning Protection System, - Installation Of Spikes With A Lightning Protection Blade On A Pole Made Of Steel Pipes, • In Terms Of Insulation: - Insulation Of The Dormer Walls With Polystyrene Boards, - Protection Of Convex Corners With A Metal Angle, - Insulation Of The Dormer Roofs With Polystyrene, - Attaching The Polystyrene Boards To The Wood, - Insulating The Roof Above The Living Area, - Performing Thermal Insulation And Acoustic Insulation In The Roof Surface. Areas - In Accordance With The Attached Measurements. Materials, Equivalent Solutio
|