2. The Subject Of The Order Is The Construction Of Warehouses In Gostycyn For The Needs Of Civil Protection And Civil Defense. This Is The Implementation Of The First Stage Of The Investment Entitled Reconstruction Of A Warehouse Building With The Construction Of A Warehouse Building With Internal And External Technical Infrastructure And Demolition Of Buildings And Structures With Technical Infrastructure, Located In Gostycyn. The Subject Of The Order Includes The Execution Of A Complete Scope Of Works Covered By The Design Documentation For The First Stage Of The Investment, In Particular Demolition Works, Works Related To The Reconstruction Of The Existing Warehouse Building, Construction Of The Designed Warehouse Building, Construction Of Internal And External Technical Infrastructure And Land Development. The Scope Of The Order Also Includes The Execution Of All Accompanying, Auxiliary And Reconstruction Works, As Well As Carrying Out Tests, Examinations, Measurements, Inspections, Commissioning, Tidying Up The Construction Site And Preparing Complete Documentation Necessary For Acceptance And Commissioning Of The Subject Of The Order.3.The Scope Of The Order Will Include In Particular, Among Others: For: 1) Carrying Out Preparatory Works, Securing And Organizing The Construction Site And Preparing The Area For The Implementation Of Works; 2) Carrying Out Demolition Works, Including In Particular The Demolition Of Existing Buildings, Structures, Sheds, Scales, Existing Hardening, Fences, Gates And Wickets And Other Infrastructure Elements Indicated In The Design Documentation; 3) Dismantling The Existing Power And Lighting Infrastructure Intended For Decommissioning, Including The Dismantling Of The Existing Overhead Power Line Together With Poles, Cables And Accessories, In Accordance With The Design Documentation;4) Demolition Of Existing Stormwater Drainage Elements, Including Wells, Connections And Cables, To The Extent Indicated In The Design Documentation;5) Execution Of Earthworks, Leveling And Preparatory Works, Including Excavations, Backfills, Soil Compaction And Restoration And Tidying Up Of The Area;6) Reconstruction Of An Existing Warehouse Building, In Accordance With The Design Documentation, Including In Particular Performance Of Construction, Architectural, Finishing And Installation Works;7) Construction Of The Designed Warehouse Building, Including In Particular The Construction Of Foundations, Foundation Walls, Building Structure, Load-Bearing And Partition Walls, Wreaths, Lintels, Partitions Required In The Design Documentation And Other Construction Elements;8) Construction Of The Roof Structure And Covering, Including The Execution Of The Truss/Roof Structure, Formwork And Battens, Roof Membrane, Trapezoidal Sheet Covering, Flashings Sheet Metal, Gutters And Downpipes And Other Roof Elements Provided For In The Design Documentation;9) Execution Of Moisture-Proof, Waterproof, Thermal And Other Insulation Required In The
|