1. Restoring The Emergency Water Intake For The Mielnik Commune To Use. The Task Is To Be Carried Out In The Design-Build Mode (For Some Of The Works It May Be Necessary To Prepare Design Documentation). 1) The Order Includes The Complete Renovation Of The Deep Well Marked As Sw-3 And The Performance Of Construction Works Related To The Implementation Of The Investment In Question. The Order Includes In Particular: - Dismantling And Disposing Of All Devices Located In The Well Casing, - Inspecting The Well Using A Color Tv Camera With Recording On A Media, - Measure The Deep Well: Water Level, Its Efficiency And Quality, Expected Depth Of The Well - 90 Meters, - Clean The Deep Well Mechanically, And Chemically If Necessary (Remove Sediment From The Bottom And Filter), - Construction Of Approx. 2 Meters Of Ø80 Stainless Steel Pressure Pipeline (Including, Among Others, 1 Water Meter For Remote Reading, 2 Worm-Drive Butterfly Valves, 1 Non-Return Valve, 1 Intake Valve Water), - Installation Of 1 Submersible Pump Adapted To The Capacity Of The Well, - Installation Of 1 Well Head, - Installation Of 2 Hydrostatic Probes In The Well, - Installation Of 1 Control Cabinet And Automation For Cooperation With The Existing One At The Municipal Utilities Plant In Mielnik (Using A Fiber Optic Connection In The Museum Building) And Emergency Power Supply, - Construction Of An Electricity Connection With A Length Of Approx. 40 Meters From The Existing Cable Connector For Powering The Well Along With 1 Socket For Emergency Connection Of A Power Generator, - Renovation Of The Well Casing Ø2000 And H = 2 M (Filling The Gaps, Installation Of 6 Steps, Insulation With Painting), - Installation Of 1 Abyssin On The Pressure Pipeline At A Distance Of 10 Meters From The Pipeline (Notification To The Starosty Required).2) Requirements Regarding Accessibility For Disabled People And Design For All Users, In Accordance With Art. 100 Paragraph 1 Of The Act: The Implementation Of The Investment Is Intended To Ensure The Use Of The Created Infrastructure By All Users, Including People With Disabilities. 3) Equivalent Solutions: A) The Ordering Party Allows The Offer Of Materials And Devices Equivalent To Those Indicated In The Technical Documentation, Provided That Their Technical, Functional And Operational Parameters Cannot Be Worse Than The Parameters Of The Materials And Devices Indicated In The Technical Documentation. The Ordering Party Will Assess Compliance And Equivalence In Consultation With The Author Of The Technical Documentation. B) Wherever The Description Of The Subject Of The Contract Contains Terms Indicating Trademarks, Patents Or Origin, Sources Or A Specific Process That Characterizes The Products Provided By A Specific Contractor, The Ordering Party Allows The Contractors To Offer Equivalent Products, Materials Or Devices. The Names And Types Used Should Be Treated As Exemplary Solutions Specifying The Criteria Used To Assess Equivalence, I.E. Quality Stan
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 117769189
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.