The Subject Of The Order Includes The Construction Of Spokojna Street In Murowana Goślina Together With The Accompanying Infrastructure, In Particular Road Works, Construction Of Storm Sewage, Reconstruction And Construction Of The Land Infrastructure Network, Construction And Reconstruction Of Road Lighting, Construction Of A Service Channel, Exits, A Pedestrian Road, Traffic Organization Elements And Accompanying Works. The Scope Of The Subject Of The Order Concerns In Particular: A) Construction Of An Access Road To Ul. Spokojna, Approx. 205 M Long, Road Width 5.0 M With Widenings Up To 6.8 M, With A Mineral-Asphalt Mixture Surface, Including Construction Of Dirt Roadsides; B) Construction Of A Connector At Ul. Spokojna, Approx. 86.41 M Long And 5.0 M Wide, With A Concrete Pavement Surface. 8 Cm In Light Gray Color, Including The Construction Of Dirt Roadsides; C) Construction Of A 2.3 M Wide Pedestrian Road Made Of Concrete Cubes. 8 Cm In Light Gray, Along With The Reconstruction Of The Existing External Stairs; D) Construction Of A Suggested Pedestrian Crossing At Km 0+068.43 Along With Waiting Zones; E) Construction Of An Intersection With Three Inlets With A Connector Of Ul. Spokojna; F) Reconstruction And Construction Of Individual Exits Made Of Light Gray Concrete Cubes. 8 Cm;G) Construction Of A Rainwater Drainage System With An Outlet To The Trojanka Canal;H) Reconstruction Of The Gas Network With Gas Connections;I) Reconstruction Of The Electricity Network With Overhead Connections;J) Construction And Reconstruction Of Road Lighting;K) Reconstruction And Security Of Telecommunications Infrastructure;L) Construction Of A Technological Canal;M) Construction Of A Retaining Wall Made Of L-Type Prefabricated Elements With A U-11A Protective Barrier;N) Execution Of Works Demolition, Preparatory, Earthwork, Construction, Surface, Finishing And Cleaning Works; O) Height Adjustment Of Elements Of The Existing Technical Infrastructure To The Extent Necessary For The Proper Execution Of The Subject Of The Order; P) Implementation Of Traffic Organization For The Duration Of The Works And Permanent Traffic Organization, In Accordance With Approved Designs And Requirements Of The Competent Authorities;Q) Preparation Of An As-Built Geodetic Inventory And Complete As-Built Documentation. Construction/Reconstruction Of Road Greenery, Including Topsoil And Sowing Of Slopes, In Accordance With The Design Documentation, Cost Estimate And Bill Of Quantities;
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 117769154
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.