1. The Subject Of The Order Is The Design And Execution Of Construction Works For The Task Titled: Construction Of A Garage And Warehouse Building With Hardening For The Needs Of Civil Protection And Civil Defense In The Design And Build System. 2. The Scope Of Works Includes: I. Development Of Design And Cost Estimate Documentation In The Scope Of: 1) Obtain A Map For Design Purposes At A Scale Of 1:500 - 1 Copy, 2) Obtain Technical Connection Conditions To Ensure Supplies And Acceptance For Utilities, 3) Obtain On Behalf Of The Ordering Party All Legally Required Arrangements, Opinions And Administrative Decisions Necessary To Develop Complete Documentation, 4) Obtain On Behalf Of The Investor A Permit To Cut Down Trees Within The Scope Of The Investment, 5) Obtain Construction Permits On Behalf Of The Ordering Party, 6) Perform Geotechnical Tests Of The Land (If Necessary) - 3 Copies, 7) Develop A Construction Design In Accordance With The Scope Of The Functional And Utility Program And Swz - 5 Copies, 8) Develop An Executive/Technical Design Architectural And Construction Industry - 5 Copies, With The Bill Of Quantities - Cost Estimate Part And Stwior - 5 Copies,9) Develop An Executive/Technical Project For The Sanitary Industry - Rainwater Drainage With The Bill Of Quantities - Cost Estimate Part And Stwior - 5 Copies,10) Develop An Executive And Technical Design For The Electrical Industry - Lighting, Monitoring With The Bill Of Quantities - Cost Estimate Part And Stwior - 5 Copies,11) Prepare A Project Temporary Traffic Organization And Media Supply For The Duration Of Construction (If Necessary).12) Prepare Designs In Electronic Version - 1 Cd Or Pen-Drive.13) Prepare As-Built Documentation - 2 Copies,14) Prepare A Fire Safety Manual,15) Obtain A Positive Opinion Of The State Fire Service In Accordance With Article 56(1) Of The Construction Law. 16) Prepare Other As-Built Documents Required By The Ordering Party, Necessary To Obtain By The Ordering Party Obtains Permission To Use The Constructed Facility, Ii. Execution Of Construction Works: 1) Carrying Out The Necessary Demolition And Transferring The Obtained Material For Recycling And Disposal, 2) Construction Of A Garage And Warehouse Building With Dimensions Of 12 M X 30 M; 3) Felling Of Trees And Removal Of Stumps Within The Scope Of The Study, 4) Execution Of All Elements In Accordance With The Developed Design Documentation, 5) Construction Of An Absorption Well, 6) Construction Of A Ditch Drainage Approx. 400 Meters; 7) Construction Of A System Fence Approx. 500 Meters; 8) Construction Of An Entrance Gate With A Wicket 1 Piece; 9) Hardening The Area With Reinforced Concrete Slabs; 10) Installation Of Concentrate Approx. 500 Meters; 11) Construction Of Area Lighting; 12) Implementation Of Video Monitoring Iii. Authors Supervision: 1. 1 Section 6 Point 2 Of This Agreement, In The Scope Referred To In Article 20 Section 1 Point 4 Of The Act Of July 7, 1994, Construction Law (Consoli
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 117769141
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.