1. The Subject Of The Order Is The Development Of A Technical And Economic Concept For The Res Installation - Mew Cieszanowice On The Luciąża River. The Study Should Include: 1/ Location Data - Hydrographic And Administrative Conditions Should Be Taken Into Account (Location, Geodetic Coordinates, National Code Of Water Bodies (Jcw), Name Of The River, Mileage). 2/ Facility Inventory - A Detailed Description Of Individual Elements Of The Hydrotechnical Facility And Installations Related To The Hydropower Plant (Water Intake With The Supply Pipeline, Water Discharge With The Bottom Water Closure, Turbine Set Chamber, Electrical Installation With Electrical Switchboards), Photographic Documentation Of The Investment Area And The Adjacent Area.3/ Expert Opinion - Determination Of The Technical Condition Of Individual Elements Of The Hydrotechnical Facility And Installations Related To The Hydropower Plant (Water Intake With The Supply Pipeline, Water Discharge With A Bottom Water Closure, Turbine Set Chamber) Along With Identification Of Damages And Operational Hazards And A Description Of Maintenance/Modernization/Renovation Works Necessary To Restore The Energy Function Of The Facility.4/ Existing And Planned Land Development - Current Method Of Use, Analysis Of Planned Investments In The Area Of Influence, Spatial Conditions That May Affect The Implementation Of The Investment.5/ Analysis Of Ownership Of The Property For The Investment - List Of Plots With Information About The Owner Based On Materials Obtained From State Geodetic And Cartographic Resources (Simplified Extracts From The Land Register), Determination Of The Possible Need To Obtain Rights To The Land, Easements, Purchases.6/ Legal And Administrative Analysis Of Investment Preparation 7/ Hydrological Analysis In The Examined Cross-Section;8/ Variant Technical Concepts Of The Investment Along With A Detailed Selection Of The Hydro Set/Hydro Sets (Power Of The Hydro Set, Type Of Turbine And Efficiency Of The Entire Hydro Set, Installed Esophagus Of The Hydro Set, Gross/Net Head) With Installations Of The Hydraulic System And Work Regulation, Electrical, Signaling, Work Monitoring Installations, Teletransmission And I&C Networks, Mechanical Ventilation And The System Fire Protection. At Least 3 Technical Variants Should Be Presented, Each Variant Should Include A Technical Description And Technological And Functional Diagrams;9/ Estimation Of Electricity Production - Calculate The Energy Potential, The Estimated Maximum Power That Can Be Installed, The Forecast Of Annual Electricity Production. A Variant Analysis Should Be Prepared For Various Technical Solutions;10/ Financial Analysis Of The Project For Individual Variants (At Least Three) Taking Into Account Capex Investment Outlays, Opex Operating Costs, Projected Revenues And Volume Of Electricity Sales, Npv Profitability Analysis, Irr, Payback Period, Sensitivity Analysis And Presentation Of Investment Profitability Results. Visua
Contact Information
Address
State Water Holding Polish Waters,Warszawa,00-613,Mazowieckie,Pl911 - Miasto Warszawa
Email
anna.muszalska@wody.gov.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 117768910
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.