|
4.1.The Subject Of The Order Is The Comprehensive Implementation Of The Task Consisting In The Delivery, Assembly And Commissioning Of 2 Pieces Of Power Generators With Full Accompanying Infrastructure, Including Electrical Installations, Automatic Reserve Switching System (Szr) And Construction And Installation Works Necessary For The Proper Functioning Of The Reserve Power System For The Facility Indicated By The Ordering Party, I.E. The Water Intake In Pasieki And The Water Intake In Szarowola.1) The Scope Of The Order Includes In Particular: - Delivery Brand New Power Generators With A Prp Rated Power Of Not Less Than 44 Kw And Not More Than 55 Kw (Maximum +25% Relative To The Required Minimum Power), Which Corresponds To Approx. 55-68.75 Kva At Cos Φ = 0.8, Along With Equipment, - Delivery And Installation Of A Complete Ats System Ensuring Automatic Switching Of Power Sources, - Construction Of An Internal Power Supply Line And Electrical Installations Related To The Connection Generator, - Construction Of Control Lines And Integration Of The Aggregate With The Existing Installation Of The Facility, - Delivery And Assembly Of A Control/Distribution Cabinet With Szr Automation, - Execution Of Protective And Operational Grounding Of The Generator And The Installation, - Execution Of The Exhaust Gas Discharge System Outside The Building, Including The Necessary Punctures And Protections, - Performance Of The Necessary Construction And Installation Works, Including: • Execution Of Installation Passages Through Building Partitions, • Construction Of Cable Ducts, • Execution Technological Openings, • Protection And Sealing Of Passages, - Assembly Of The Unit In Accordance With The Manufacturers Requirements, Including The Use Of Vibration-Insulating Elements, - Performance Of All Auxiliary, Preparatory And Accompanying Works Necessary For The Proper Implementation Of The Task, - Carrying Out Tests, Examinations And Measurements Of The Installation And The Ats System, - Starting The Unit And Performing Tests Of Operation Under Load, - Training The User In The Operation Of The Device, - Preparing As-Built Documentation And Submitting Test And Measurement Reports. 2) The Scope Of The Order Includes The Performance Of All Works Separately For Each Location, In A Way That Enables The Independent Functioning Of Each System. The Purpose Of The Order Is To Ensure Automatic, Reliable Backup Power Supply To The Facility, Through The Integration Of The Generator With The Existing Electrical Installation And The Ats System3) Final Remarksthe Scope Of The Order Also Includes All Works And Activities Necessary For The Correct And Complete Execution Of The Subject Of The Order, In Accordance With The Design Documentation, Technical Specification For The Execution And Acceptance Of The Works And Applicable Regulations And Standards. A Detailed Description Of The Subject Of The Order Is Included In The Technical Documentation, Bills Of Quantities And Stwiorb - Ann
|