|
Building Construction Work – Construction Of A Multi-Family Residential Building With Technical Infrastructure In Szczucin. 1. The Subject Of The Order Is The Construction Of A Multi-Family Residential Building For The Needs Of Social Housing Construction. The Basic Function Will Be A Residential Function And A Recreational Function (Green Areas With A Public Recreation Area). The Whole Will Be Supplemented With The Necessary Communication Infrastructure (Access Roads, Ramps) And Technical Infrastructure (Construction Equipment, External Installations And Connections). A Functional Layout Is Planned On 3 Above-Ground Floors, I.E. On The Ground Floor, 1St Floor, And 2Nd Floor. The Building Was Designed With The Main Entrance On The West Side. The Building Has An Entrance Via 2 Separate Staircases. Vertical Communication Provided By Staircases And Passenger Lifts Adapted To Transport Disabled People. The Building Has 57 Residential Premises, Including 5 Adapted For Disabled People, 57 Storage Units And Technical Rooms. The Building Will Be Constructed In A Traditional Way - Made Of Silicate Blocks. The Building Was Adapted To The Existing Ground Level. Finishing The External Walls Of The Building Using The Traditional Light-Wet Method. The Height Of The Ground Floor From The Ground Is 0.32 M. The External Walls Are Two-Layer Brick Made Of 24 Cm Thick Silicate Blocks, Insulated With A Layer Of Thick Polystyrene. 25 Cm. Covering The Building With A Gable Roof With A 4˚ Slope In The Form Of A Flat Roof. All Ceilings In The Building Were Designed As Reinforced Concrete Ceilings Using A System Of Prestressed Filigree Slabs. 2. The Utility Program Is Planned To Be Arranged On Three Above-Ground Floors, I.E. On The Ground Floor, First Floor And Second Floor. The Building Does Not Have A Basement. 3. As Part Of The Subject Of The Order, The Contractor Will Obtain, On Behalf Of And On Behalf Of The Ordering Party, The Final Decision On The Occupancy Permit For The Completed Construction Works. For This Purpose, The Ordering Party Will Provide The Contractor With An Appropriate Power Of Attorney. 4. The Subject Of The Order Includes The Execution Of: A) Preparatory, Earthwork And Construction Works, B) Floors, C) Joinery, D) Internal And External Finishing Works, E) Hardened Surfaces, F) Lawns, G) Recreation Areas, H) Garbage Wool, I) Water Supply Connection, J) Sanitary Sewage Connection, K) Heating Installation, L) Installation Mechanical Ventilation, M) Domestic Hot Water Installation, N) External And Internal Drinking Water Installation, O) Internal And External Sanitary Sewage Installation, P) Switchgear, Q) Lighting Installation, R) Installation Of Plug Sockets And Power, S) Earthing, Lightning Protection Installation And Equalizing Connections, T) Structural Installation, U) Rtv System, V) Video Intercom Installation W) Pv Installations, X) External Network And Lighting Installations 5. A Detailed Description And Scope Of The Subject Of The Order Is Specified In: A) Design Documentation - Annex No. 5 To The Swz, B) Bills Of Quantities - Annex No. 4 To The Swz, C) Stwiorb - Annex No. 6 To The Swz, D) Designed
|