Civic Center Construction Work – Demolition Work. Preparatory Measures: Create 1 Psch Interim Storage Facility On The Immediate Construction Site; 1,000 M2 Dust Protection Wall (Surface Scaffolding); # Demolition Of Building: 1 Piece Of Demolition Of Old Vehicle Hall (Single-Story Masonry Building, Divided Into Individual, Separately Accessible Units, Used As A Garage, Gable Roof Made Of Nail Board Trusses And Roof Covering Made Of Corrugated Asbestos Panels): Total Gross Floor Area: 1805 M², Total Gross Volume: 12,850 M³; # Disposal: Pick Up 1261 Tons Of Non-Hazardous Construction, Demolition And Municipal Waste And Dispose Of It In Accordance With The Recycling Management Act; The Contractor Assumes The Disposal Costs; 577 To Collect Hazardous Construction, Demolition And Municipal Waste And Dispose Of It In Accordance With The Recycling Management Act; The Contractor Covers The Disposal Costs. # Dismantling Construction Water System: 1 Connection Point (Connection Point) For Construction Water And Supply Lines Of The Sanitary Container Completely Dismantle And Restore The Original Condition Distance Existing Connection Point (External Water Connection) To The Construction Water Intake Point And Sanitary Container: Up To 50 M # In Addition To The Proof Of Suitability According To §6A Eu Vob/A, The Bidders Must Submit The Following Evidence When Submitting An Offer: 1. Proof Of Specialist Knowledge According To Trgs 524 (Protective Measures For Activities In Contaminated Areas) 2. Proof Of Specialist Knowledge According To Trgs 519 (Asbestos Demolition, Renovation Or Maintenance Work)
Contact Information
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 117749481
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.