Sewer Construction Work – Löberstraße, Puschkinstrasse-Stauffenbergallee 3.Ba And Emergency Drainage - Complex Civil Engineering. Lot 1: Lt 02 Wastewater Disposal And Lt 23 Emsr, Lot 2: Lt 08 Road Construction And Lt 11 Open Space Design Lot 1 Wastewater Disposal And Emsr Lt 02: Wastewater Disposal - Conversion Of A Separation And Throttle Structure Incl. 4 Pieces. New Construction And Closure Of Existing Access Openings, Renewal Of The Complete Equipment Technology Including Bypass Line And Throttle Line Dn 300 Stainless Steel With Fitting And Expansion Pieces, 2 Knife Gate Valves Dn 300 As Shut-Off Valves In Both Lines, 1 Ducted Mid With Control Valve In The Throttle Line, 1 Bilge Pump, 1 Pipe Fan, Lighting, Etc. - Production Of A Valve Shaft Structure Made Of Reinforced Concrete, - Production Of A Reinforced Concrete Cover/Securing Structure For A Piped Body Of Water, - Civil Engineering Work For The Laying Of Gas Pipelines Dn 200 And Dn 300, - Civil Engineering Work For Drinking Water Pipelines Dn 250, Dn 300 And Dn 400 Ggg Including Earthworks, Wastewater Drainage, Various Demolition And Conversion Measures In The Old Building And Construction-Related Traffic Control And Security For All Work. Lt 23: Emsr Technology For A Separation And Throttle Structure Lot 2 Road Repair Lt 8: - 7 Pcs. Road Gullies, 50 M Pipe Dn 150 Pp, 80 M Empty Cable Pipe Dn 110, - 2 Pcs Road: 985 M² Asphalt Base Layer D=12 Cm, 985 M² Asphalt Binder D=6 Cm, 1370 M² Asphalt Concrete D=4 Cm, - For Cycle Path: 130 M² Asphalt Base Layer D=8 Cm, 130 M³ Asphalt Concrete D=3 Cm - 240 M Concrete Curbs, 42 M Paving Channel Made Of Large Slag Paving From The Ag, - 15 M Granite Borders Of The Ag, 17 M Kassel Crossing Borders, 125 M Granite Edging Stones, - 280 M² Concrete Slabs, 125 M² Small Granite Paving, 115 M² Concrete Paving, - 7 M² Anthracite Ribbed Slabs, 6 M² Anthracite Studded Slabs, - 14 Pieces Of New Traffic Signs And Road Markings Lt 11: - 350 M² Of Topsoil, 225 M² Of Lawn Seeding, 125 M² Of Mulching Area, - 50 M² Of Slope Protection With Jute Fabric, Protection For Existing Large Trees, - 310 Pieces Of Ground Cover Planting Including Completion And Development Care Lt 01 General Services For Lot 1 And Lot 2
|