Construction Work – Carpentry And Wood Construction Work. 2-Storey School Building As A Hybrid Building, Building Floor Area Approx. 1,300 M² (Of Which Approx. 135 M² Is Solid Construction). Proportion Of The Tight Building Envelope: Interior Walls Approx. 1,100 M², External Walls Approx. 1,400 M², Interior Walls Approx. 1,100 M²) In Elemental Wooden Panel Construction, Including Aluminum External Windows And Doors With Integrated Sun Protection And A Curtain Facade Made Of Wooden Slats. Ceiling Construction Elements With Visible Wooden Beams And 2-Layer Osb Ceiling Pane, Approx. 1,950 M² For Both Floors, Additional Cross-Laminated Timber Ceiling (D = 160 Mm), Approx. 400 M² For Both Floors. Vapor Barrier + 3-Layer Roof Sealing Made Of Bitumen Membrane With Gradient Insulation Made Of Mineral Wool Approx. 1300 M², Including Rainwater Drains And Roof Installations Such As Smoke Exhaust, Roof Exit And Roof Skylights With Dimensions Of 8.60 M X 1.67 M + 7.35 M X 1.67 M - Extensive Green Roof Approx. 1300 M, Including Gravel Strips, With Maintenance For 4 Years, Roof Area Approx. 1300 M²; Safety-Relevant, Load-Bearing Aluminum Roof Edge Railing, Approx. 200 Running Meters
Contact Information
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 117731615
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.