Tenders Are Invited For Architectural, Engineering And Planning Services – City Of Neuötting - Extension Of ... in Germany
Tender Notice
TenderID
117731556
Tender Brief
Tenders Are Invited For Architectural, Engineering And Planning Services – City Of Neuötting - Extension Of The Max Fellermeier Elementary And Middle School - Property Planning For Buildings Lph 1-9
Architectural, Engineering And Planning Services – City Of Neuötting - Extension Of The Max Fellermeier Elementary And Middle School - Property Planning For Buildings Lph 1-9. City Of Neuötting - Expansion Of The Max Fellermeier Elementary And Middle School Building Property Planning Services In Accordance With § 34 Ff. Hoai, Service Phases 1-9 The City Of Neuötting Is Planning To Expand The Max Fellermeier Elementary And Middle School On Simbacher Straße In Neuötting. The Elementary School Was Built In 1963 And The Middle School Was Added In 1969. Most Recently, Energy-Saving Renovations And Various Fire Protection Measures Were Carried Out. There Are Currently Around 590 Students (357 Primary School Students, 233 Middle School Students) Being Taught At The School. Due To Increasing Student Numbers, Changing Educational Requirements, The Expansion Of All-Day Education And Care Offerings As Well As Additional Space Requirements For Teaching, Care And Administration, The School Location Is Increasingly Reaching Its Capacity Limits. To Examine The Structural Development Options, A Feasibility Study Was Created As Of August 14, 2025. The Study Is Part Of The Tender Documents And Is Made Available To All Bidders As A Uniform Information Basis. The Findings, Assumptions And Preliminary Investigations Contained Therein Are Considered To Compensate For Disadvantages For All Bidders. The Author Of The Feasibility Study Will Not Take Part In The Further Procurement Process, Especially Not In The Subsequent Negotiation Process. As Part Of The Feasibility Study, The Urban Planning, Functional, Technical And Economic Framework Conditions Were Examined And Various Development Options Were Evaluated. The Preferred Option Was To Expand The School Location Through An Independent Extension Building On The East Side Of The Middle School. The “Music Hall” Extension From 1982, Previously Used As A Conference Room On The Ground Floor, Now Used For Classes Due To Lack Of Space, And The Primary Schools Wtg Room In The Basement, Will Be Demolished For This Purpose. Additional Classrooms, Group And Support Rooms, A Wtg Room For The Primary School, A Divisible Science Room, A Conference Room And The Necessary Technical And Ancillary Areas Are Planned. In Addition, Measures To Improve Accessibility And To Implement Them In The Most Compatible Way Possible During Ongoing School Operations Were Considered. The Preferred Variant Has A Net Floor Space (Nrf) Of Around 1,442 M² For The Extension. The Cost Estimate Determined For This As Part Of The Feasibility Study Amounts To Around Eur 6.9 Million Gross. Including The Additionally Examined Elevator Systems, The Estimated Total Gross Costs Are Around Eur 7.84 Million (Brodmann Study, As Of 08/2025). The Feasibility Study Forms The Basis For Further Planning. The Aim Of The Tendered Services Is The Planning Specification, Continuation And Implementation Of The Preferred Variant Developed There. The Main Results, Planning Approaches And Recommendations Of The Feasibility Study Must Be Taken Into Account In Further Planning
Contact Information
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 117731556
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.