Construction Project Management Services – Areal A - Projektmanagementleistungen Mit Bim. Project Management Services With Bim For The Following Project: The Area A Project Includes The Construction Of A New Laboratory Building, A Gate And A Parking Garage. The Chemical/Process Engineering And Microbiological Laboratories Will Be Housed In The Laboratory Building. The Building Also Includes Storage And Office Space. The Gate Is Intended To Serve As A Central Access Point To The Factory Premises On Sipplingen Berg. In Order To Be Able To Cover The Parking Space Requirements For Employees And Visitors, A Parking Garage Is To Be Built Here In A Central Location. 2. Construction Field The Construction Area Marked In The Illustration Below Represents A Binding Outer Edge, Which Must Be Adhered To When Submitting A Final And Binding Offer. The Construction Site Consists Of A Plot Of Land Measuring Approximately 5,500 M², Which Is Bordered By The Service Roads And Contains The So-Called Wind Chamber System. There Is Also An Area Of Approx. 900 M² To The Left Of The So-Called West Operating Road. The Construction Site Is Bordered On All Sides By Service And Access Roads. In Addition To Paved Parking Areas And Vegetation Areas, The Wind Generator Building Is Currently Located On The Site. The Wind Tank System Houses Several Pressure Compensation Tanks. These Serve The Purpose Of Absorbing The Pressure Surges That Emanate From The 1St Main Line. There Are Several Power And Water Lines Leading Into And Out Of The Building. In Particular, The Sipplinger Bergs Own Water Supply With Drinking Water And The Supply Of Cooling Water For The Backup Power Systems Runs Via The Wind Boiler System Building. The Water Supply Of Area A Is Beyond Planning. The Access To The Wind Kiln Building Must Be Maintained At Least In The Current Dimensions. Adjacent To The Construction Site Boundary In The Southeastern Area, The Überlingen Haldenhof Connection Line Is Routed In The Street Area Next To A Dirt And Sewer. The Wastewater Disposal Of Area A Is To Be Established Via This Canal. Furthermore, Various Power, Measurement, Control And Telecommunications Cables Run Within The Construction Site As Well As Surface Drainage Lines. Clearing The Construction Site Is A Service That Is Not Awarded As Part Of This Procedure, But Is Carried Out By The Client Himself. For The Planning Task, It Can Therefore Be Assumed That The Wiring And Cable Routing Will Be Reorganized In The Future And The Area Can Be Largely Replanned. Coordination Between The Planner And The Client To Clarify Interfaces Is Necessary In Any Case. The Building Site And Surrounding Development, Including All Associated Services, Must Be Taken Into Account In Connection With Their Integration Into The Ground When Planning The Shoring And Excavation Pit For The Newly Constructed Buildings. The Geotechnical Reports Are Available. The Results Can Be Found In Appendix S. A Detailed Overview Of The Lei Described Above
Contact Information
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 117730936
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.