|
The Subject Of The Order Is The Reconstruction Of The Room. Ksw Wimir No. 013 At The Microscopy Laboratory In The P-B3-B4 Section Of The Agh, Including In Particular: 1. Construction Works:• Relocation Of Existing Furniture Equipment From The Rooms Intended For Reconstruction To The Place Indicated By The Ordering Party Within Buildings B-3 And B-4 And The Battens, I.E. Up To 400 Meters And 4 Floors Without The Use Of A Crane.• Demolition And Disassembly Works• Disassembly Of Existing Floor Layers.• Construction Of New Floor Layers, • Construction Of A Reinforced Concrete Slab, • Construction Of New Door Lintels, • Delivery And Assembly Internal Aluminum Joinery, • Replacement Of Doors, • Replacement Of External Windows With Windows With Fire Resistance Ei60, • Construction Of A Casing Made Of Plasterboards, • Delivery And Assembly Of Structures For The External Air Conditioning Unit, • Preparation Of Putties And Painting, • Delivery And Installation Of A Mounting Bracket For The Projector, • Delivery And Installation Of A Projection Screen, • Replacement Of The Existing Carpet In The Corridor, • To Be Performed Together With The Subsequent Restoring All Necessary Wall And Ceiling Penetrations.2. Electrical Works:• Expansion Of The Existing Main Switchboard, • Construction Of Wlz For The Design Of Switchgears, • Construction Of New Cable Routes, • Installation Of Sockets, 1-Phase And 3-Phase Outlets, • Installation Of Dedicated Data Sockets, • Installation Of Basic Lighting, • Construction Of An Emergency Evacuation Lighting Installation, • Expansion Of The Ssp Installation, • Expansion Of The Buildings Telecommunications Installation, • Installation Of A Cctv System, • Construction Of An Access Control Installation, • Construction Of An Burglary And Attack Alarm Installation. Sswin,• Disassembly Of Electrical Installations, 3. Sanitary Works:• Construction Of A Mechanical Ventilation Installation,• Construction Of An Air-Conditioning Installation,• Construction Of A Compressed Air Installation,• Replacement Of A Central Heating Installation.• Construction Of A Water And Sewage System.• Delivery And Assembly Of A Cylinder Cabinet.• Construction Of A Technical Gas Installation. The Offer Should Not Include The Equipment Described In The Drawings:• Fig. 09-A - Laboratory Table• Fig. 10-A - Conference Tables• Fig. 12-A - Projector• Fig. 18-A - Furniture: Presenters Desk, Conference Chairs, Office Chairs, Heater,• Fig. 19-A - Interactive Monitorthe Contractor Should Provide A Full Warranty For The Works Covered By The Scope Of The Order (For The Entire Order (Materials, Devices, Equipment, Labor) For The Works Covered By The Scope Of The Order For A Period Of Not Less Than 36 Months (3 Years) In Accordance With The Conditions Specified In The Warranty Statement, With The Exception Of: - Windows, Where The Warranty Period Cannot Be Shorter Than 10 Years, - Structural (Logical) Network Installations, Where The System Warranty Period Granted By The Manu
|