|
The Subject Of The Task Is The Implementation Of The Task Titled: Reconstruction Of The Courtyard And Areas Adjacent To Primary School No. 3 In Kępno, Together With Sports And Technical Infrastructure And Development Of The Adjacent Area, Contributing To The Greening Of Urban Areas And Improving The Quality Of Public Space - Improvement Of Educational Infrastructure. The Subject Of The Construction Project Is In Particular: 1) Construction Of A Complete Sports Field And A Running Track With A Long Jump Jump, Including: - A Football Pitch With Dimensions Of Approx. 45 X 23 M (Playing Field 20 X 40 M) With Synthetic Grass, 8-Meter Ball Catchers, Goals, - Circular Track (100, 200, 400 M) And Straight Track (60 M), - Long Jump Jump, - Field Gym, - Lighting, - Benches, Waste Bins, Regulations, - Rainwater Installation With Rainwater Tank, - Sidewalks, - Playground With Polyurethane Surface (Trampoline, Integration Set, Integration Carousel, Benches, Regulations, Waste Bin) - Planting Greenery The Project Described In Point 1 Is Financed Under The Project Revitalization Of The City Of Kępno No. Fewp.07.01-Iz.00-0030/24-00 As Part Of: Priority 07 European Funds For Local Initiatives In Wielkopolska Measure 07.01 Revitalization Of The European Funds For Wielkopolska 2021-2027 Program.2) Comprehensive Development Of The Playground Area Of Primary School No. 3 In Kępno, Including: - Meeting Zone, Relaxation Zone, Games Zone, - Playground, - Construction Of Grass Surfaces, - Implementation New Plantings Of Trees And Shrubs And Ornamental Plants, - Construction Of A Fire Road, - Parking Zone With Shelters For Bicycles And Scooters, - System Of Baskets And Containers For Selective Waste Collection - Construction Of Fencing Of The Area - Construction Of 2 Outdoor Educational Classes For Younger Children Along With Delivery And Installation Of Accompanying Infrastructure - Construction Of Drainage Installations, Irrigation Installations, Water Supply And Sewage Installations, And Water Supply Connections And Installations Fire Protection - Electrical Power And Lighting Installations, Led Lighting Installation (Energy-Saving), Monitoring. The Project Described In Point 2 Is Financed By The European Union Under The National Reconstruction And Resilience Plan - Loan Supporting The Green Transformation Of Cities, Investment B3.4.1 Investments For The Green Transformation Of Cities, Based On The Contract Concluded By The Ordering Party With Bank Gospodarstwa Krajowego. Detailed Description Of The Subject Of The Order And Scope The Task Was Specified In The Contract, Design Documentation, As Well As The Technical Specification For The Execution And Acceptance Of The Works, Which Constitute Annexes To This Swz. Attention! Due To The Performance Of Construction Works On The Premises Of The Primary School No. 3 In Kępno And The Łabądek Nursery In Kępno, The Ordering Party Divides The Works Into Three Stages. Carrying Out Construction Works Should Start From Stage No. 1.
|