1) The Subject Of The Order Is The Reconstruction Of Ul. Wjazdowa In Chojne Along With Drainage On A Section With A Length Of Approx. 281.58 M. The Reconstruction Will Be Carried Out On The Section From The District Road No. 1708E (Ul. Sieradzka). The End Of The Reconstruction Took Place In Chojne, Behind The Intersection With Ul. Piaskowa And Ul. Działkowa, At Km 0+280, At Plot No. 1116/1, Chojne District. 2) Basic Technical Parameters Of The Road After Reconstruction: - Road Category - Not Specified, - Technical Class - Private Internal Road, - Traffic Category - Kr1, - Design Speed - Min. 30 Km/H, - Asphalt Road - Width 5.5 M, - Road - Transverse Inclination 2% (Roof System, Except For The Curve), - Pedestrian Route With Asphalt Surface - Width From 1.75 M To 3.2 M, - Aggregate Shoulders - Width Min. 0.8 M, - Shoulders - Transverse Inclination Of 6%.3) The Scope Of The Road Reconstruction Includes The Following Elements: - Widening The Existing Road From A Width Of Approx. 4.5 M To A Width Of 5.5 M, - Adapting The Surface Structure To The Designed Width, - Reconstruction Of The Existing Road Drainage System Consisting In Eliminating An Open Drainage Ditch And Constructing A Closed Rainwater Drainage System In Its Place, - Constructing Drainage Elements In The Form Of Pipes, Wells And Devices For Draining Rainwater From The Road, Such As Linear Drainage Channels On The Section From Km 0+011 To Km 0+234, − Renovation Of A 1.5 M Wide Pedestrian Road Located On The Left Side (Replacement Of Damaged Elements), − Construction Of An Asphalt Pedestrian Route In Place Of The Existing Ditch On The Right Side On The Section From Km 0+004 To Km 0+194, − Renovation And Construction Of Exits Ordinary Roads And Individual Plots, − Drainage Of The Road Using Sections Of Rainwater Sewage System, − Installation Of A New Curb On The Right Side On The Section From Km 0+234 To Km 0+259. 4) A Detailed Description Of The Subject Of The Order Is Specified In The Architectural And Construction Design Together With The Technical Design, Bill Of Quantities And Detailed Technical Specification - Annexes No. 8, 9, 10 To The Swz.5) By Submitting An Offer In This Procedure, The Contractor Undertakes To Provide A 60-Month Warranty Period For The Completed Construction Works From The Date Of Fault-Free Final Acceptance. The Warranty Period Is Equal To The Warranty Period. 6) A) The Ordering Party Requires The Employment Under An Employment Contract, Within The Meaning Of The Provisions Of The Act Of June 26, 1974, Labor Code (Consolidated Text: Journal Of Laws Of 2025, Item 277, As Amended) By The Contractor Or Subcontractor Of Persons Performing The Activities Indicated Below During The Execution Of The Order: - Operation Of Devices, Machines And Construction Equipment, - Activities Related To Roadside And Road Works Ditches, - Activities Related To Works In The Field Of Road Substructure, Surface And Drainage, (This Obligation Does Not Apply To The Construction/Works Manage
|