|
A. Subject Of The Order: The Subject Of The Order Is The Construction Of A Selective Municipal Waste Collection Point With Technical Infrastructure In Gostyń At Ul. Pszczyńska To The Extent Specified In The Description Of The Subject Of The Order And In The Design Documentation. The Works Are Carried Out As Part Of The Investment Task Titled Construction Of A Selective Municipal Waste Collection Point With Technical Infrastructure In Gostyń, Co-Financed By The European Funds For Silesia Program 2021-2027.B.The Main Scope Of Works Includes:1.Preparatory And Earthworks: Mowing Grass, Cutting Down Self-Seeded Trees, Clearing The Area Of Accumulated Materials, Debris, Etc., Earthworks, Leveling The Area, Making Trenches And Bases For Hardened Surfaces Along With Parking Spaces In Accordance With The Construction And Executive Design, Removing Conflicts With Existing Infrastructure.2.Facilities And Shelters: Foundation And Assembly Of Social And Office Facilities For Pszok Staff (According To The Design), Installation Of Shelters And Storage Containers Intended For Storing Waste Requiring Protection Against Weather Conditions (E.G. Electronic Waste, Chemicals, Used Furniture), Separation Of Tight, Hardened Places For Containers For Selective Waste Collection (E.G. Rubble, Bulky Items, Plastics, Glass, Metal).3.Technical Infrastructure: Construction Of Connections And Internal Installation Networks In Accordance With The Design, I.E.: Sanitary Sewage Connection With An On-Site Sewage Pumping Station, Water Supply Connection With A Hydrant For Fire Protection Purposes, Reconstruction Of The Water Supply Network, Area Lighting, Low Voltage Cable Lines, Power Installation, General Lighting Installation, Installation Of Equalizing Connections, Electric Shock Installation, Surge Protection Installation, Lightning Protection Installation And Grounding, Video Monitoring Installation, Cable Ducting.4.Land Development And Small Architecture: Construction Of A Fence For The Pszok Area Together With Entrance Gates And Wickets, Installation Of An Entrance Barrier / Entry Control Systems, Installation Of Information Boards With The Regulations For Using The Pszok And A List Of Accepted Waste, Planting Plants, 5.Specialized Equipment: Delivery And Assembly Of A Truck Scale - In Accordance With The Description Of The Subject Of The Order, Delivery Of Fire-Fighting And Extinguishing Equipment With Markings In Accordance With The Project Requirements And Fire Safety Instructions Prepared After The Completion Of The Works By The Contractor, Delivery Of A Set Of Specialized Containers, Containers And Marked Baskets For The Selective Collection Of Individual Fractions Of Municipal Waste In Accordance With The Design And This Description, Delivery And Assembly Of Mobile Unloading Platforms, Delivery And Commissioning Computer.6.Technical And Material Requirements:1) Construction Works Should Be Performed In Accordance With The Submitted Design Documentation, Technical Sp
|