1. The Subject Of The Order Is The Execution Of Flood Protection Works On The Kalnica Stream, A Right-Bank Tributary Of The Jedlica Stream, At Km 0+015 - 0+230 In The Town Of Kowary, Commune. Kowary, Karkonosze County, According To The Illustrative Map Constituting Annex No. 11 To Swz.2. The Scope Of Works Includes: 1) Contractors Facilities Along With Accompanying Works And Measurements (Including Geodetic Measurements - Indication Of Plot Boundaries) - 1 Set; 2) Mowing Of Slopes With Raking, Dense Growth - 110 M2; 3) Manual Cutting Of Dense Bushes With Disposal - 60 M2; 4) Felling Of Trees With A Diameter Of 10-15 Cm – 32 Pcs.;5) Cutting Down Trees With A Diameter Of 16-25 Cm – 65 Pcs.;6) Cutting Down Trees With A Diameter Of 26-35 Cm – 4 Pcs;7) Cutting Down Trees With A Diameter Of 36-45 Cm – 3 Pcs;8) Cutting Down Trees With A Diameter Of 46-55 Cm – 4 Pieces;9) Cutting Down Trees With A Diameter Of Over 75 Cm (80 Cm) – 1 Pc; 10) Cutting Down Trees With A Diameter Of Over 75 Cm (110 Cm) With A Boom Or Mountaineering - 2 Pcs; 11) Cutting Down Trees With A Diameter Of Over 75 Cm (140 Cm);12) Desilting With The Removal Of Debris And Blockages And Profiling Of The Bed - 58 M3;13) Demolition Of Stone And Concrete Walls - 30.5 M3 (25.5 - Mechanical Demolition, 5 M3 - Manual Demolition);14) Linear Excavations For The Foundation And Wall Thickness. Humid – Gr. Category Iv 175.6 M3 (Mechanically - 142 M3, Manually - 33.6 M3);15) Concrete Buildings 103.74 M3 - (64.24 M3 - Foundation (C25), 39.5 M3 - Wall Body (C25));16) Execution Of Stone Cladding Of The Wall With Dimensions Stone 20 - 30 Cm – 9.41 M3; 17) Execution Of Stone Cladding Of The Wall With Dimensions 20 Cm Stone – 28.9 M3; 18) Construction Of A Stone Buttress With Dimensions 20 - 30 Cm – 35.2 M3; 19) Making Rip-Rap At The Bottom With Stones With A Size Of 30 Cm - 6 M3;20) Making Rip-Rap With Heavy Stone With A Size Of 50 Cm - 3 M3; 21) Abrasive Blast Cleaning Of The Wall Face - 236 M2;22) Removal Of Old Joints And Loose Wall Elements - 46.8 M2;23) Pointing Of The Wall Face - 336.25 M2;24) Manual Backfilling Behind The Walls Of The Building With Soil Compaction Of Category Iii - 96.6 M3;25) Earthworks - 50 M3;26) Single-Row Pipe Drainage Ф 5 Cm Every 2.5M - 45.8M;27) Gravel Backfill Around The Drainage From The Underground Side, Secured With Geotextile 350 G/M2 - 1.94 M3;28) Vertical Expansion Joint With Dry Roofing Felt - 11.7 M2;29) Removal Of Excavated Material And Demolition Debris To Distance Up To 15 Km Including Disposal – 97.3 M3; 30) Making Rails From Round Larch Logs 2X25 Cm, Length 3 M - Steel Pins Ф 14 Mm L=0.5 M 2 Pcs. / Rail) - 32 Pcs.; 31) Pumping Water From Excavations - 180 M2;32) Cleaning Works With The Restoration Of A Hedge (12 M2) And Sowing The Area - 200 M2;3. The Contractor Is Obliged To Provide Environmental Supervision: 1) The Contractor Is Obliged To Conduct Environmental Supervision Throughout The Entire Period Of Work; 2) The Environmental Supervision Should Be Perf
Contact Information
Address
Gmina Miejska Kowary,Kowary,58-530,Dolnośląskie,Pl515 - Jeleniogórski
Email
bok@kowary.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 117704611
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.