|
1. The Subject Of The Order Is The Construction Of Park Lighting, Including The Construction Of A Cable Line, Installation Of Electrical Boxes, Lighting Poles With Fixtures And The Performance Of Necessary Accompanying And Reconstruction Works, In Accordance With The Design Documentation. The Investment Is Located Along The Path In Słowiański Park, Connecting The Bus Terminus At Ul. Marcinkowskiego With Arena Gorzów At Ul. Słowiańska. Necessary Scope Of The Task To Be Performed By The Contractor: - Before Starting Construction Works, First Of All, Trees In The Immediate Vicinity Of The Investment Should Be Secured. Greenery Works Are To Comply With The Adopted Standards For The Protection Of Trees And Other Forms Of Greenery In The Investment Process (Annex To The Design Documentation), - Drainage (As Part Of The Planned Works, The Contractor Will Dispose Of All Waste Extracted During Earthworks), - Laying Of Cable Lines, - Installation Of Zk And So Electrical Boxes, - Installation Of Lighting Poles With Fixtures, - Cutting Of Tree Branches In The Event Of Their Collision With Fixtures (Cutting At Height, All Cuts Carried Out Will Be In Accordance With Applicable Standards For The Protection Of Trees And Other Forms Of Greenery In The Investment Process), - Construction Of Retaining Walls In Places Exposed To Erosion, - Performance Of All Accompanying Works Referred To In The Design Documentation, - Measurements And Tests, - As-Built Geodetic Map Along With Reporting Changes To The Geodesy And Cartography Center, - Restoration Of The Investment Area And The Area Adjacent To The Investment (Topsoil And Grass Sowing), 2. The Ordering Party Requires That The Offered The Materials In Their Forms And Shapes Met The Requirements Specified In The Design Documentation And Swz Provisions. The Detailed Scope Of Work Was Specified In The Technical Documentation: - Technical Specification For The Execution And Acceptance Of Construction Works, - Detailed Design, - Construction Design, - Site Development Design, - Arrangements And Other Studies, - Agreement With The Contractor (Design) 3. Conditions Required From Contractors: - Obtaining All Necessary Permits And Arrangements Required During Construction, - Keeping Construction Documentation Resulting From Applicable Regulations, - If Carrying Out All The Works Covered By The Bill Of Quantities Will Require The Execution Of Auxiliary And Detailing Projects, The Contractor Will Develop Them On His Own And At His Own Expense, Obtaining The Necessary Arrangements And Decisions, - The Contractor Will Provide A Warranty For The Completed Subject Of The Order In Accordance With The Offer And Will Remove All Defects And Faults Noticed During This Period In Accordance With The Contract, - Throughout The Duration Of The Contract, Also In The Event Of Any Need To Temporarily Interrupt The Works, The Contractor Will Secure And Supervise The Construction Site And Bear All Related Costs. Other Detailed Requirements Of The
|