|
1. The Subject Of The Order Is The Execution Of Construction Works Consisting In The Replacement Of Sewer Lines And The Renovation Of Bathrooms In The Building Of The Sieradz City Hall On The Northern Side.2. The Following Tasks Must Be Performed As Part Of The Order:2.1. Preparatory And Demolition Works In The Scope Of A) Securing The Work Site And Rooms Subject To Renovation, B) Performing The Necessary Dismantling And Demolition Works, C) Dismantling Existing Wall And Floor Coverings, D) Dismantling Existing Door Joinery, E) Dismantling Suspended Ceilings, F) Dismantling Sanitary Equipment And Fittings, G) Dismantling Water Supply, Sewage, Ventilation And Electrical Installations Covered By The Scope Of The Study, H) Dismantling Existing Sanitary Sewage Lines, I) Waste Disposal And Management In Accordance With Applicable Regulations, 2.2. Construction Works In The Scope Of A) Execution Of Necessary Construction And Construction Works Resulting From The Documentation, B) Construction Of New Openings, Brickwork And Installation Penetrations, C) Construction Of Casings Made Of Plasterboards, D) Construction Of Walls And Installation Structures, E) Execution Of New Plasters, Plasters And Repair Works, F) Execution Of Moisture-Proof Insulation, G) Construction Of Wall Coverings With Ceramic Tiles, H) Construction Of New Floors Along With With Cladding, I) Construction Of Suspended Ceilings, J) Installation Of Door Joinery, K) Performance Of Painting Works, L) Installation Of Bathroom Equipment And Rooms Covered By The Study, 2.3. Sanitary Works In The Scope Of A) Replacement Of Sanitary Sewage Pipes, B) Construction Of A New Sanitary Sewage System With Connections To The Devices, C) Construction Of A New Cold And Hot Water And Circulation Installation, D) Installation Of Shut-Off And Intake Fittings, E) Installation Of Sanitary Equipment, Including Suspended Toilet Bowls, Washbasins, Sinks And Other Equipment, F) Performance Of Tightness Tests Of The Installation, G) Performance Of Rinsing, Disinfection And Bacteriological Tests Of The Installation Water Supply, H) Installation Of A Mechanical Ventilation System With Fans, Ventilation Ducts, Vents And Control Elements, I) Adjustment And Commissioning Of The Installation, 2.4. Electrical And Telecommunications Works In The Scope Of A) Construction Of A New Basic Lighting Installation, B) Construction Of An Emergency And Evacuation Lighting Installation, C) Installation Of Plug Sockets, D) Expansion Of Existing Floor Switchboards With The Required Security Measures, E) Construction Of A Power Supply Installation For Sanitary And Ventilation Devices, F) Installation Of Equalizing Connections, G) Construction Of A Ventilation Power Supply Installation, H) Expansion Of The Existing Fire Alarm System (Ssp), Including The Installation Of New Detectors, Expansion Of The Control Panel And Updating The System Configuration, I) Performing Electrical Measurements And Functional Tests,2.5. Finishing And Cleani
|