1. The Subject Of The Order Is The Implementation Of A Task Called: Replacement Of Lighting With Energy-Saving Ones In The Popów Commune, Including The Replacement Of Old Street And Park Lighting Based Primarily On Traditional Discharge Light Sources With New Energy-Saving Led Lighting In The Popów Commune.2. The Task Is Aimed At Achieving Savings As A Result Of The Modernization Of Lighting In The Commune. The Scope Of Replacement Includes Lighting Fixtures Mounted Mostly On The Poles Of The Lv Overhead Power Line Owned By Tauron Dystrybucja S.A. Together With The Built-In Elements Of The Lighting Network Owned By Tauron Nowe Technologie S.A. Which Includes: Overhead Line Cables, Booms, Lighting Fixtures With Power Cables, Fuse Holders And Clamps.3. The Task Is To Perform Works Related To The Replacement Of Lighting With Energy-Saving Ones In The Popów Commune - Stage 1, Including Circuits From Transformer Stations Included In The List Under Numbers: 8, 9, 10, 13, 14, 15, 25, 26, 27, 28, 29, 30, 43, 44, 45, 46, 47, 48, 49. As Part Of The Subject Of The Order, The Contractor Is Obliged In Particular To: • Dismantle Existing External Lighting Fixtures On A Pole Spindle Or Boom - 313 Sets; • Replace Tubular Booms Mounted On Poles - 313 Pcs., However The Existing Booms Should Be Reused If They Are In Good Technical Condition And Meet The Required Length Parameter Of 1.0 M; Otherwise They Must Be Replaced; The Valuation Should Assume The Replacement Of 50% Of 313 Pcs Of Booms For Replacement• Installation Of New Outdoor Led Lighting Fixtures On The Booms - 313 Pcs;• Installation Of Fuse Boxes In Lighting Circuits - 313 Pcs;• Installation/Replacement Of Cables In The Booms, In Protective Tubes - 313 Sets;• Replacement Of Fuse Holders And Power Cables On The Modernized Circuits;• Laying Of The Cable Energy Yakxs 0.6/1 Kv 4×35 – 136 M;• Execution Of 3-Phase Overhead Connectors Related To Reactive Power Compensation – 17 Sets;• Installation Of Electrical Devices Weighing Up To 2.5 Kg – 10 Pcs.;• Equipping Circuits On Which More Than 15 Led Luminaires Are Installed With Systems Limiting The Starting Current Of The Luminaires (Soft Starter) – 10 Set;• Execution Of Reactive Power Compensation Systems By Installing Appropriate Cabinets/Compensators In Place Of Existing Lighting Cabinets, Separately For Transformer Stations, In Accordance With The Audit;• Execution Of Connections, Fastenings And Accessories Necessary For The Proper And Safe Operation Of The Modernized Circuits;• Performance Of Measurements And Checks Required For The Proper Acceptance Of The Installation;• Commissioning And Checking The Operation Of The Modernized Lighting, Including Power Limitation/Compensation Systems, If Provided For In The Documentation;• Execution Accompanying Works, Including Securing The Work Site, Tidying Up The Area And Managing And Removing Waste Generated In Connection With The Execution Of The Order;• Preparation And Submission Of As-Built Documentation And Docum
|