1. The Subject Of The Order Is The Execution Of Construction Works Under The Name: Construction Of A Garage And Warehouse Facility For The Needs Of Olioc On The Premises Of The District Road Administration In Augustów Description Of The Subject Of The Order: Building In The Form Of A Rectangular Block Covered With A Flat Roof With An Inclination Of 3 Degrees. Single-Story Building, Low (5.25 M). Finishing And Colors Of The Facade (As Described In Fig. Facade): - Walls: Sandwich Panels With A Polyurethane Core And Mineral Wool In Graphite Color - Roof: Roof Covering - Roof Sandwich Panel In Graphite Color - Sheet Metal Flashings: Steel Sheet - Graphite Color - Gutters, Downpipes: Rectangular Steel, Graphite Color - Window And Door Joinery And Joinery - Graphite Color - Building Height (Wall Edge) Attic Measured From The Ground Level At The Lowest Entrance To The Building) 5.25 M - Dimensions Of The Building 55.00 M M2 Total Area Of The Designed Building 687.50 M22.The Order Includes A Basic Scope - Stage I, The Execution Of Which Is Guaranteed, And An Optional Scope - Stage Ii, The Execution Of Which Depends Solely On The Decision Of The Ordering Party.3.The Basic Scope Includes Works Specified In The Bill Of Quantities For The Construction Of The Hall - Stage I (Basic), And Appropriate Works Resulting From The Design Documentation And Technical Specifications For The Execution And Acceptance Of Works, Constituting Annexes To The Swz. The Scope Of Works Of The Basic Scope (Stage I) Includes: - Earthworks - Foundations - Insulation Of Foundation Walls - Steel Structure - Roof - Structure And Covering - Wall Cladding (3 Sides) - Joinery Windowsthe Optional Scope Includes Only Works Specified In The Bills Of Quantities Called Stage Ii (Optional), I.E.: - Bill Of Quantities For Hall Construction - Stage Ii (Optional) - Bill Of Quantities For Electrical Internal Installation. - Stage Ii (Optional) - Bill Of Quantities For External Installation - Stage Ii (Optional) - Bill Of Quantities For Water Installation - Stage Ii (Optional) - Bill Of Quantities For Hydrant Construction - Stage Ii (Optional) Which Include The Following Scopes: - Floors - Wall Cladding (Front Side) - Door Joinery - Equipment (Pallet Racks) - Trim - Surface - Driveway - Fencing - Construction Of Hydrant And Water Supply Installations, - Construction Of Underground Electrical Installations. A Detailed Catalog Of Works Covered By The Option Right, Together With Units And Maximum Quantities Of Works, Is Included In The Above-Mentioned. Bills Of Quantities Marked As Stage Ii (Optional). The Optional Scope Is A Functionally And Technically Related Supplement To The Construction Of A Garage And Warehouse Facility Included In The Basic Scope. Optional Works Concern Elements Of The Same Facility, Its Development Or Equipment And May Only Be Performed In Connection With The Implementation Of The Basic Scope. The Optional Scope Does Not Constitute A Separate Investment Or A New Subject Of Pro
Contact Information
Address
Powiatowy Zarząd Dróg W Augustowie,Augustów,16-300,Podlaskie,Pl843 - Suwalski
Email
sekretariat@pzd-augustow.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 117662892
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.