Quotation are invited for Special Coating - Touch-up Painting of Natural Gas Lines including RM1 at L2 Station. SCOPE OF WORK AND METHOD STATEMENT FOR TOUCH-UP PAINTING OF NATURAL GASLINES AT L2 STATION DURING TSD 2026/2027WORK LOCATION#L2 STAT ION, JEBEL ALI POWER STATION#PLANNED DURATION#SEVEN (7) CALENDAR DAYS DURING THE L2 TSD#TENTATIVE START DATE#13 NOVEMBER 2026, SUBJE CT TO DEWA CONFIRMATION#WORK TYPE#EXTERNAL WASHING, LOCALIZED MECHANICAL SURFACE PREPARATION,AND TOUCH-UP PAINTING#1.0 PURPOSE, SCOP E, AND WORK LIMITS1.1 THIS DOCUMENT DEFINES THE SCOPE, RESPONSIBILITIES, CONTROLS, ANDEXECUTION METHOD FOR EXTERNAL SERVICE-WATER WA SHING, INSPECTION,LOCALIZED MECHANICAL SURFACE PREPARATION, SPOT PRIMING, AND BRUSH/ROLLERTOUCH-UP PAINTING OF DESIGNATED NATURAL-GA S LINES AT L2 STATION DURINGTSD 2026/2027.1.2 THE CONTRACTOR SHALL PROVIDE COMPETENT MANPOWER, SUPERVISION,APPROVED COATING MATERIAL S, CONSUMABLES, TOOLS, APPLICATION ANDINSPECTION EQUIPMENT, TRANSPORTATION, PROTECTION MATERIALS, HSECONTROLS, HOUSEKEEPING, AND DOC UMENTATION NECESSARY TO COMPLETE AND HANDOVER THE WORKS. FULL REMOVAL OF SOUND COATING, ABRASIVE BLASTING,ULTRA-HIGH-PRESSURE WATER JETTING, AND FULL-AREA AIRLESS SPRAY PAINTINGARE EXCLUDED UNLESS SEPARATELY APPROVED IN WRITING BY DEWA.1.3 DUSUP VALVES 65-HV-1511 AND 65-HV-1512 SHALL BE COVERED, CLEARLYMARKED #DO NOT TOUCH,# AND PROTECTED THROUGHOUT THE WORK. OPERATION,ADJUSTMENT, DISMANTLING, CLEANING, PAINTING, LOADING, STRIKING,CLAMPING, OR PHYSICAL CONTACT WITH THESE VALVES IS PROHIBITED.2.0 WORK LOCATIONS AND ESTIMATE D QUANTITIESITEM#DESCRIPTION#ESTIMATED AREA#FINISH COLOUR#2.1#RM1 NATURAL-GAS PIPING, DN 400 AND DN 500: SERVICE-WATER WASHING,LOCAL IZED MECHANICAL CLEANING, AND TOUCH-UP PAINTING#60 M²#TRAFFICYELLOW, RAL 1023#2.3 THE STATED QUANTITIES ARE ESTIMATES. AFTER WASHING , DEWA AND THECONTRACTOR SHALL JOINTLY IDENTIFY AND MEASURE THE ACTUAL DEFECTIVECOATING AREAS. PAYMENT SHALL BE BASED ON ACCEPTED CO MPLETED QUANTITIESUNLESS THE PURCHASE ORDER STATES OTHERWISE.3.0 RESPONSIBILITIES AND PRE-EXECUTION REQUIREMENTS·#DEWA SUPERVISOR: C OORDINATE THE ACTIVITY, VERIFY PERMITS ANDISOLATIONS, CONFIRM DUSUP REQUIREMENTS, AND SUPERVISE EXECUTION.·#OPERATIONS: ISOLATE AND DEPRESSURIZE THE LINE, CONFIRM SAFECONDITION, ISSUE APPLICABLE PTW/LC, AND ACCEPT REINSTATEMENT.·#CONTRACTOR: PROVIDE COMPETENT SUPE RVISION, PAINTERS, COATINGINSPECTOR, HSE REPRESENTATIVE, APPROVED MATERIALS, EQUIPMENT,INSPECTION, AND RECORDS.·#SCAFFOLDING CONTRAC TOR: ERECT, INSPECT, TAG, MODIFY, AND DISMANTLESCAFFOLDING WITHOUT LOADING OR ATTACHING IT TO GAS-SYSTEM EQUIPMENT.·#BEFORE WORK, TH E CONTRACTOR SHALL COMPLETE THE SITE VISIT AND OBTAINAPPROVAL OF THE METHOD STATEMENT, RISK ASSESSMENT, ITP, WORK PROGRAMME,COATING PROCEDURE, MATERIAL SUBMITTAL, SAFETY DATA SHEETS, COMPETENCYRECORDS, EQUIPMENT CERTIFICATES, AND VALID DUSUP NOC.·#WORK SHALL BEGIN ONLY AFTER THE LIMITS, ACCESS ROUTE, PROTECTEDCOMPONENTS, ISOLATION, SAFE GAS CONDITION, PTW/LC, EMERGENCYARRANGEMENTS, AND COMMUNI CATION METHOD ARE CONFIRMED.4.0 EXECUTION METHOD1.#BRIEFING AND AREA PREPARATION: CONDUCT THE TOOLBOX TALK, BARRICADETHE WORK AREA, POST WARNING SIGNS, MAINTAIN EMERGENCY ACCESS, PROTECTDRAINS AND NEARBY EQUIPMENT, AND INSTALL TARPAULINS, GREEN MESH,COLLECTION SHE ETS, AND SPILL CONTROLS.2.#SCAFFOLDING: ERECT APPROVED SCAFFOLDING WITHOUT ATTACHING, CLAMPING,STRIKING, LOADING, OR SUPPORTING ANY COMPONENT ON GAS PIPES, VALVES,INSTRUMENTS, OR FITTINGS. A COMPETENT PERSON SHALL INSPECT AND TAG ITBEFORE USE.3.#ISOLATION: OPERATI ONS SHALL ISOLATE AND DEPRESSURIZE THE LINE ANDISSUE THE APPLICABLE PERMIT. CONTRACTOR PERSONNEL SHALL NOT OPERATE ANYPLANT VALVE. Qty: 60 2.2#NATURAL-GAS SYSTEM PIPING ON THE PIPE RACK: SERVICE-WATER WASHING,LOCALIZED MECHANICAL CLEANING, AND TOUCH-UP PAINTING AS IDENTI FIED BYJOINT INSPECTION#250 M²#TRAFFIC YELLOW, RAL 1023# Qty: 225 Special Coating - Touch-up Painting of Natural Gas Lines including RM1 at L2 Station during TSD 2026/2027 Contact ehab.bahour@dewa.gov.ae STANDARD TERMS & CONDITIONS 1) Prices should be DDP delivery duty paid at DEWA stores. 2) Quotation to be submitted only in local currency U.A.E Dirhams 3) DEWA Standard payment terms is 30 days credit from the date of acceptance of material 4) No DEWA staff or his or her relatives up to third degree should have ownership or partnership in your company, and your participation in DEWA tenders / RFQs should not constitute a Conflict or perceived Conflict of Interest. Supplier Registration: https://srm.dewa.gov.ae/irj/portal/anonymous/regis Tender Link : https://srm.dewa.gov.ae/sap/opu/odata/sap/ZSRM_RFX_REG_BID_SRV/AttachmentSet(2332602162)/$value
|