1) The Subject Of The Order Is The Expansion And Reconstruction Of A Service Building - Part I - Washing Room With A Warehouse. Land Development. Insulation Of The Roof Of The Car Wash And The Walls Of The Social Area. Part Ii - Renovation Of The Roof Covering Of The Remaining Part Of The Building (Workshops, Offices) Along With The Necessary Partial Insulation Of The Walls And Replacement Of Windows. The Order Constitutes A Uniform Scope Of Works And Is Not Divided Into Parts. The Contractor Submits One Price Offer Covering The Entire Subject Of The Order.2) The Scope Includes In Particular: • Expansion Of The Washing Room With Reconstruction Of The Existing Part Of The Building In Order To Create A Functional Car Wash Room And An Adjacent Warehouse. • Land Development Including: - Construction Of Sanitary Sewage From The Car Wash Room (Sewage Wells, Settling Tanks, Separators) In Accordance With The Design, - Construction Of Access Roads, Access Roads, Hardening To The Car Wash Rooms, Approximately 239 M2.- Organizing And Adapting The Infrastructure Of The Area To The New Function Of The Facility.• Insulation Of The Roof Of The Car Wash And The Walls Of The Social Part, Moisture-Proof Insulation Of Foundation Walls In Accordance With The Design Documentation And Applicable Standards (Roof 30 Cm, Walls 15 Cm).• Renovation Of The Roof Covering Of The Part Containing Workshops And Offices, Including: - Dismantling The Existing Roofing, - Making A New Roof Covering, - Necessary Accompanying Works (Sheet Metal Work, Gutters, Security).• Partial Insulation Of Walls To The Extent Specified In The Design Documentation.• Replacement Of Windows In Areas Undergoing Renovation.3) Description Of The Subject Of The Order For A High Pressure Generator.• Power Supply Not Less Than: 3/400/50Ph/V/Hz,• Pumping Capacity Not Less Than: 460-900 L/H• Pressure Not Less Than: 40-180/4-18 Bar/Mpa• Maximum Working Pressure Not Less Than: 20 (200) Mpa/Bar• Incoming Water Temperature: From 70 C To 85 C.• Fuse: 16A.• Connection Power: 6.8 Kw Description Of The Manual Washing Installation:• Distribution Along The Hall On Both Sides Of The Room.• It Should Consist Of A Guide Rail With Trolleys, Handles, High-Pressure Hose And A Control Panel.• System Length Not Less Than: 2 X 10 M (On Both Sides Of The Hall.• Steel Platforms On Both Sides Of The Car Wash.• Heaters In The Car Wash Room Powered By Hot Water From The Central Heating Network.4) Additional Requirementsthe Contractor Is Obliged To:• Carry Out The Works In Accordance With The Design Documentation, Stwior And Applicable Regulations.• Providing Work Managers In All Specialties Consistent With The Subject Of The Order, With Appropriate Construction Qualifications, To The Extent Necessary To Manage The Construction Works In Question, In Accordance With The Provisions Of The Construction Law.• Securing The Area Where The Works Will Be Carried Out (Construction Site).• Carrying Out The Works In A Way That Minimizes Diff
Contact Information
Address
Przedsiębiorstwo Usług Komunalnych Spółka Z O.O.,Borne Sulinowo,78-449,Zachodniopomorskie,Pl427 - Szczecinecko-Pyrzycki
Contact No.
943732900
Email
biuro@puk-bornesulinowo.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 117652511
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.