Part No. 1 - Construction Of Road Lighting On The Road Ul. Pogodna In The Town Of Franciszków And Construction Of A 0.4 Kv Lv Network For Road Lighting Of The Internal Road - Ul. Nadstawna In The Town Of Mełgiew, Commune Mełgiew. The Task Includes: - Construction Of Road Lighting On Ul. Pogodna In The Town Of Franciszków, Commune Mełgiew, Including The Construction Of A Cable Lighting Line With A Route Length Of 35 M And The Construction Of A Suspended Lighting Line With A Total Length Of 197 M, Made On 2 Designed Lighting Poles And 4 Existing Poles Of The 0.4 Kv Lv Line, - Construction Of A 0.4 Kv Lv Network For Road Lighting Of The Internal Road - Ul. Nadstawna In The Town Of Mełgiew, Commune Mełgiew, Including The Construction Of A Lighting Cabinet Sz. O., Construction Of A Wlz Line Supplying An 18 M Long Lighting Cabinet And Construction Of A Cable Lighting Line With A Route Length Of 1,194 M Along With 27 Lighting Poles. The Scope Of The Order Includes In Particular The Construction Of Cable And Overhead Lighting Lines, Installation Of Poles And Lighting Fixtures In Led Technology, Construction Of The Necessary Power Supply And Control Devices, Grounding And Protection, As Well As Execution Of Accompanying Works, Including Works Earthworks, Securing The Existing Technical Infrastructure, Restoring The Area And Performing The Required Measurements, Tests And Acceptances. In Addition, The Task Includes The Installation Of Lighting Fixtures That Will Be Compatible With The Existing Street Lighting Monitoring And Management System In The Mełgiew Commune (The System Is Based On Cpanet-Rabbit Controllers), Including The Purchase Of Sim Cards, Activation Fees, As Well As Preparation Of As-Built Documentation And Inventory Of The Cable Line With The Location Of Poles. The Detailed Scope, Method Of Execution And Requirements For The Implementation Of The Works Are Set Out In Annex No. 12A - Design Documentation For Task No. 1.2.The Order Should Be Performed In Particular In Accordance With The Design Documentation And The Technical Specification For The Execution And Acceptance Of Works Constituting Annex No. 12A To The Swz, Taking Into Account The Provisions Of The Swz And The Contract (Annex No. 10A To The Swz).3.A Detailed Description Of The Subject Of The Order For Each Part Includes In Particular: 1) Design Documentation (Construction Design, Technical Design), 2) Technical Specification For The Execution And Acceptance Of Works.4.The Subject Of The Order Must Be Performed In Accordance With Applicable Legal Provisions, In Particular The Act Of July 7, 1994, Construction Law (Consolidated Text: Journal Of Laws Of 2026, Item 524, As Amended) Along With Implementing Regulations, Standards And Instructions Of Manufacturers Of The Equipment And Materials Used, Principles Of Technical Knowledge And Construction Practice.5.The Materials Provided And Used By The Contractor Should Meet, In Terms Of Quality, The Requirements For Products Approved For Tra
|