1. The Subject Of The Order Is The Construction Of A Charging Station For Electric Vehicles And The Construction Of A Photovoltaic Installation With A Capacity Of 17.1 Kwp As Part Of The Task Entitled: Construction Of A Publicly Available Charging Station For Electric Vehicles In The Commune And City Of Odolanów. The Task Is Co-Financed By The Provincial Fund For Environmental Protection And Water Management In Poznań.2. The Task Will Consist In The Delivery And Installation Of: 1) A Two-Station Charging Station For 120 Kw Electric Vehicles With 2 Ccs Dc Connectors And One 22 Kw Ac Connector And A Two-Station Charging Station For Electric Two-Wheelers With A Power Of 3.6 Kw, Along With Equipping These Stations With A System Enabling Refueling And Direct Payment And Based On Publicly Available Applications Enabling Finding A Station, Starting Charging And Settling Transactions, E.G. By Linking A Payment Card In The Application Or Scanning The Qr Code At The Station;2) A Photovoltaic Installation With A Capacity Of 17.1 Kwp On The Ground On A Steel Structure With An Area Of Approximately 79.40 M2 In Horizontal Projection. Vehicle Charging Stations With A Photovoltaic Installation On The Ground On A Steel Structure Will Be Located On Plots No. 761 And No. 760, Aleja Jana Pawła Ii 2, 63-430 Odolanów.2. A Detailed Description Of The Subject Of The Order Includes: Design Documentation, Bill Of Quantities And Stwiorb Prepared By Dastore Instalacje Electrical, Ul. Majakowski 22, 63-400 Ostrów Wielkopolski. The Bill Of Quantities Is For Auxiliary Purposes Only. Bearing In Mind That This Procedure Assumes A Lump Sum Price For The Execution Of The Subject Of The Order, The Contractor Will Prepare An Offer Only On The Basis Of The Design Documentation And Technical Specifications For The Execution And Acceptance Of Construction Works, Constituting Annexes To The Swz.3. Note: There Is An Existing Gas Network In The Investment Area, Located In The Immediate Vicinity Of The Planned Investment Elements. As Of The Date Of Initiation Of The Proceedings, The Conditions For The Implementation Of Works In The Area Of The Existing Gas Network Have Not Yet Been Finally Agreed With Its Operator. The Ordering Party Will Request Appropriate Arrangements. The Contractor Is Obliged To Carry Out The Works Taking Into Account The Existing Gas Infrastructure And The Conditions And Requirements Specified By The Relevant Network Operator, Provided To The Contractor By The Ordering Party During The Execution Of The Order. Any Requirements Of The Operator Regarding The Manner Of Carrying Out Works In The Vicinity Of The Gas Network Should Be Taken Into Account When Performing The Subject Of The Order.4. Pursuant To The Contract For Connection To The Power Grid No. P/26/044061 Of June 26, 2026 (Defined By The Conditions No. P/26/044061), The Implementation Of The Power Infrastructure Necessary To Connect The Device To The Network Will Be Completed By October 31, 20265. The Contra
Contact Information
Address
Gmina I Miasto Odolanów,Odolanów,63-430,Wielkopolskie,Pl416 - Kaliski
Email
sekretariat@odolanow.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 117652270
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.