|
Bids Are invited for Operation And Maintenance Of Electrical Systems/Electrical Installations - Operation Maintenance Of Street Light And Car Park Area Lighting Adjacent To Old Itb Dtb, Operational Building Area, Residential Complex, Cisf Barracks And Other Areas As .. - Operation And Day To Day Maintenance Of Existing Street Lighting System Including Connected Outdoor Feeder Pillars Associated With Street Lights Available At Different Area (Outside Operational Area) At Nscbi Airport Kolkata As Mentioned In Annexure –A Including Attending Day To Day Complains /Faults /Breakdowns And Taking Proper Rectification Action, Ensuring Serviceability Of The Available System As Per Scope Of Work By Engaging Manpower As Per Annexure-B As Specified In The Special Condition Of Contract & Technical Specification And As Directed By The Eic. , Dismantling Of Existing Pole Cc Collar I/C Removing Of Loop In Loop Out Box, End Connection Etc. As Required, Shifting The Dismantled Material At Aai Store & Re-Installation If Or As Required As Directed By The Eic, Testing And Commissioning Of New Loop-In-Loop-Out Box Supplied By Aai And Making Necessary Cl Ing Arrangement To Fix In Pole And Necessary Electrical End Termination Using Suitable Aluminium Lugs And Brass Compression Gland Arrangement Suitable Of Existing Cable I/C Gi Earth Termination To The Loop In Loop Junction Box As Required For Complete Commissioning Of Street Light And As Directed By The Eic. , Dismantling Of Existing All Kinds Of Street Light Pole (Tubular/Gi Octagonal / Swaged Etc.) Pole Up To 12-Meter Length Either From The Existing Cc Foundation (Made Of Rcc/Brick/Pcc Etc.) Or Cutting The Poles From Based With Necessary Arrangement As Instructed By Competent Authority I/C Associated Loop-In-Loop - Out Box / Junction Box From The Embedded Into The Collar Before Dismantling Of Same, Existing Light Fixtures And Brackets (If Applicable), Wires, Cable And Stacking All Dismantled Materials At The Aai Stores As Required And As Directed By The Eic. , Supply & Drawing Of 3C X 2.5 Sq. Mm Frls Pvc Insulated Copper Conductor Non Armoured Single Core Cable From Loop-In-Loop-Out Box Mounted On The Pole Up To Top Of The Existing Pole Light Fixtures Including Necessary Electrical Connection (Both In Light Fitting Side And Loop In Loop Out Box Side) For Commissioning Of The Pole Lights As Complete As Required And Instructed By The Eic. , Supply Of Loop-In-Loop-Out Box Made Of Polycarbonate/Thermoplastic With Hinged Door With Locking Arrangement Along With Earthling Terminal & Enclosure Of Ip65 Or Higher Degree Of Protection & Necessary Electrical Arrangement Of 4-Pole, 100A Frp Terminal & 1 No. 16A Sp Mcb Within The Box As Complete As Required And As Instructed By The Eic. , Supplying And Fixing 63A 4 Pole Rating, 240/415 Volts, C Curve, Miniature Circuit Breaker Suitable For Inductive Load Of Following Poles In The Existing Mcb Db / Outdoor Feeder Pillar / Loop-In-Loop Out Box Complete With Connections, Testing And Commissioning Etc. As Required. , Supply And Fixing Of Astronomical Timer For Street Light Control (Timer Controls) As Per Is 9000 Of Rating 1 Ph 16 Suitable For Ac Supply Of 230 Volt, 50 Hz & With Ip 54 Or Above Protection & Suitable For Operation Temperature -10 To +50 Deg C Including Provision Of Mannual Control As Complete As Required And As Directed By The Eic. , Scrapping, Cleaning And Painting Of Street Light Cc Collar (Made Of Rcc/Brick/Pcc Etc.) In Black & White Alternate Strips With Two Or More Coats With Suitable Enamel Paint For Exterior Application As Approved By Engineer In Charge Complete As Required. Cc Collars To Be Paint Synthetic Enamel Paint Of Approve Colour By Engineer-In-Charge. , Repairing Of Existing Street Light Cc Collar (Made Of Rcc/Brick/Pcc Etc.) With Cement Plaster (1 Cement: 4 Sand) Of Mix To Rectify The Broken Part Of The Cc Collar Along With Necessary Finishing Work To Restore The Aesthetic & Regular Shape Of Same As Complete As Required And As Directed By The Eic. , Pruning, Trimming, Shaping Of Trees /Shrubs/ Branches (Of Height 15 Feet And Above) Along The Road / Path Way Obstructing The Lights Emits From Of The Existing Street Lights To Ensure The Proper Illumination Of The Area Including Removal Of Cutting Materials Beyond Airport Premises With Necessary Arrangement Of The T & P As Complete As Required As Per Direction Of Eic. , The Execution Of Delhi Schedule Of Rates (E&M) 2025 Of Estimated Amount Of Rs 4,00,000.00 (I/C Gst) Items Mentioned In Chapter 01& 02 Including Appendix-I & Ii As When Required Basis For Repair/Maintenance/ Addition / Alteration Etc.Of Electrical Installations.[Quoting In The Rate 10% Below Agency Has To Quote 0.90 In The Rate Coloum The Estimated Amount Of Rs 4,00,000.00(I/C Gst) Means Amount Will Be Rs 3,60,000.00/-.Similarly Quoting In The Rate 10% Above Agency Has To Quote 1.10 In The Rate Coloum The Estimated Amount Of Rs 4,00,000.00 (I/C Gst)Means Amount Will Be Rs. 4,40,000.00/-
|