Supply Of supply and installation of heavy duty shelving storage racks , supply and installation of heavy duty shelving storage rack for auxiliary motors with metal pallets (size- 2440 mm (c/l) x 1200 mm d x 3600 mm h,total load bearing capacity: 03 ton) as per specification1 copy attached. [ warranty period: 30 months after the date of delivery ] ] , supply and installation of heavy duty shelving storage rack for auxiliary motor with metal pallets (size-2 200 mm (c/l) x 950 mm d x 2820 mm h,total load bearing capacity: 03 ton) as per specification2 copy attached. [ wa rranty period: 30 months after the date of delivery ] ] , supply and installation of heavy duty shelving storage rack for compressor with metal pallets (size-285 0 mm (c/l) x 1150 mm d x 4115 mm h,total load bearing capacity: 3.6 ton) as per specification3 copy attached. [ wa rranty period: 30 months after the date of delivery ] ]
Contact Information
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 117589027
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.