|
1. The Subject Of The Order Is The Performance Of Design And Cost Estimate Works As Well As Construction And Assembly Works In The Design And Build Formula As Part Of The Task Entitled: Rationalization Of Energy Consumption Through Thermal Modernization And The Use Of Renewable Energy Sources In A Public Building At Stępów 31B, 99-412 Kiernozia - Ii Procedure.2.Address And Location Of The Subject Of The Order: Town: Stępówdz. Registry Number: 483/6 Registry District 0015 Commune: Kiernoziawoj. Łódź Voivodeship, Poviat: Łowicz3.The Scope Of The Subject Of The Order Includes: 1) Development Of Design And Cost Estimate Documentation Specified In The Functional And Utility Program (Hereinafter Referred To As Ffu) Constituting Annex No. 8 To The Swz And In The Building Energy Audit Constituting Annex No. 9 To The Swz, Along With Obtaining, Among Others: - Legally Required Decisions, Opinions, Arrangements For The Planned Project, - On Behalf Of The Ordering Party, The Final Decision On The Building Permit Or Making An Effective Notification Of Works Constructiondesign Documentation Must Be Developed: - Taking Into Account The Requirements Regarding Accessibility For Disabled People Or Design For All Users, - Taking Into Account Accessibility Conditions, So That People With Disabilities Can Use The Services Provided On An Equal Basis With Other Users, - In Such A Way That The Facilities Are Adapted For All Social Groups, Regardless Of Their Race, Gender, Beliefs, In Accordance With The Principle Of Non-Discrimination And In A Way That Guarantees Equal Opportunities For All Interested Entities And Natural Persons, - In Accordance With The Principles Universal Design2) Preparation Of The Area For The Investment,3) Performance Of Construction And Assembly Works Based On The Design Documentation Prepared In Accordance With The Ffu And The Building Energy Audit, Including: A) Thermal Renovation Of Walls And Vertical Insulation Of Foundation Walls, B) Repair Of The Roof Covering, C) Roof Insulation, D) Replacement Of The Roof Covering In The Part Where Asbestos-Cement Boards Are Placed And Their Disposal, E) Rebuilding Chimneys, F) Replacing Sheet Metal Flashings, G) Repainting Walls And Repainting Them, H) Replacing Doors And Windows, I) Rebuilding The Existing Bathroom, J) Painting Internal Walls And Ceilings On The Ground Floor, K) Construction Of A Central Heating Installation Water With Water Air Heaters And Radiators, L) Replacement Of The Heat Source With A Wood Pellet Boiler Of A Higher Standard, M) Reconstruction Of The Electrical Installation, N) Finishing Works, O) Repair Of The Entrance Stairs To The Building, P) Installation Of A Photovoltaic Installation With An Energy Storage Facility, Q) Purchase And Installation Of The Buildings Energy Management System, 4) Authors Supervision Over The Entire Task, 5) Preparation Of As-Built Documentation, Including The Development Of A Geodetic Inventory As-Built,6) Reporting On Behalf Of The Ordering Party
|