|
Tender For Thalla Lagama To Upper Garkote Km 6Th Onwards- Providing And Laying In Position Cement Concrete Of Specified Grade Including Curing But Excluding The Cost Of Centring And Shuttering. All Work Upto Plinth Level With: 1:1½:3 (1 Cement :1½ Coarse Sand: 3 Graded Stone Aggregate 20 Mm Nominal Size) Providing And Laying Damp-Proof Course 50 Mm Thick With Cement Concrete 1:2:4 (1 Cement:2 Coarse Sand: 4 Graded Stone Aggregate 20 Mm Nominal Size) And Curing Complete Pointing On Stone Work With Cement Mortar 1 : 3 (1 Cement : 3 Fine Sand) Flush/Ruled Pointing Providing & Laying Of Rcc Pipe 40 Inch Dia, Including Earth Work Cutting, Cushioning And Then Laying Of Pipes In Proper Position To Required Gradient And Camber, Including Dressing, Watering, Compacting With All Cost And Carriage Of Material Complete Job. Backfilling Of Stone Duly Hand Packed I.E On Horizontally Behind Wall/Abutments, Including All Carriage Complete As Per Direction Of Engineer Incharge At Site . Carriage Of Materials By Mechanical Transport Including Loading, Unloading And Stacking Complete Job: Sand Stone Aggregate Avg Lead Upto 46 Km Cement Avg Lead Upto 12 Km 3 Nos Causeway Earth Work In Excavation By Mechanical Means (Hydraulic Excavator) In Trenches For Foundations, Drains, Pipes, Cables Etc. (Not Exceeding 1.5 M In Width) And For Shafts, Wells, Cesspits And The Like Not Exceeding 10 Sqm On Plan, Including Dressing Of Sides And Ramming Of Bottoms Lift Upto 1.5 M, Including Getting Out Excavated Earth And Disposal Of Surplus Excavated Earth As Directed, Within A Lead Of 50 Metres:All Kinds Of Soil : Providing And Laying Of Dry Stone Soling Hand Packed Including All Cost And Carriage Complete Job As Per Direction Of Engineer Incharge At Site. Providing And Laying In Position Cement Concrete Of Specified Grade Including Curing But Excluding The Cost Of Centring And Shuttering. All Work Upto Plinth Level With: 1:3:6 (1 Cement : 3 Coarse Sand : 6 Graded Stone Aggregate 40 Mm Nominal Size) Providing And Laying In Position Specified Grade Of Reinforced Cement Concrete Including Curing But Excluding The Cost Of Centering, Shuttering, Finishing And Reinforcement. All Works Upto Plinth Level 1:1½:3 (1 Cement : 1½ Coarse Sand : 3 Graded Stone Aggregate 20 Mm Nominal Size) Centering And Shuttering Including Strutting, Propping Etc. And Removal Of Form For: Foundations, Footings, Bases Of Columns Etc. For Mass Concrete. Steel Reinforcement For R.C.C. Work Including Straightening, Cutting, Bending, Placing In Position And Binding All Complete Upto Plinth Level Hot Rolled Deformed Bars Carriage Of Materials By Mechanical Transport Including Loading, Unloading And Stacking Complete Job: Sand /Stone Aggregate Avg Lead Upto 46 Km Cement Avg Lead Upto 12 Km Construction Of Granular Sub-Base By Providing Close Graded Material Conforming To Specifications, Mixing In A Mechanical Mix Plant At Omc, Carriage Of Mixed Material By Tippers To Work Site, For All Leads & Lifts, Spreading In Uniform Layers Of Specified Thickness With Motor Grader On Prepared Surface And Compacting With Vibratory Power Roller To Achieve The Desired Density, Complete As Per Specifications And Directions Ofengineer-In-Charge. With Material Conforming To Grade-I (Size Range 75 Mm To 0.075 Mm) Having Cbr Value-30 R-Wall Earth Work In Excavation By Mechanical Means (Hydraulic Excavator) In Trenches For Foundations, Drains, Pipes, Cables Etc. (Not Exceeding 1.5 M In Width) And For Shafts, Wells, Cesspits And The Like Not Exceeding 10 Sqm On Plan, Including Dressing Of Sides And Ramming Of Bottoms Lift Upto 1.5 M, Including Getting Out Excavated Earth And Disposal Of Surplus Excavated Earth As Directed, Within A Lead Of 50 Metres: All Kinds Of Soil : Random Rubble Masonry With Hard Stone In Foundation And Plinth Including Leveling Up With Cement Concrete 1:6:12 (1 Cement : 6 Coarsesand : 12 Graded Stone Aggregate 20Mm Nominal Size) Upto Plinth Level And Curing Complete With: Cement Mortar 1:6 (1 Cement : 6 Coarse Sand) Nallah Stone Dry Random Rubble Masonry With Hard Stone In Foundation And Plinth: With Bond Stone. Nallah Stone Pointing On Stone Work With Cement Mortar 1 : 3 (1 Cement : 3 Fine Sand) Flush/Ruled Pointing Providing & Laying Damp-Proof Course 40 Mm Thick With Cement Concrete 1:2:4 (1 Cement:2 Coarse Sand: 4 Graded Stone Agg 12.5 Mm Nominal Size) And Curing Complete Centering And Shuttering Including Strutting, Propping Etc. And Removal Of Form For: Foundations, Footings, Bases Of Columns Etc. For Mass Concrete. Carriage Of Materials By Mechanical Transport Including Loading, Unloading And Stacking Complete Job: Sand/Stone Aggregate Avg Lead Upto 46 Km Cement Avg Lead Upto 12 Km Stone Avg Lead Upto 22 Km B-Wall Earth Work In Excavation By Mechanical Means (Hydraulic Excavator) In Trenches For Foundations, Drains, Pipes, Cables Etc. (Not Exceeding 1.5 M In Width) And For Shafts, Wells, Cesspits And The Like Not Exceeding 10 Sqm On Plan, Including Dressing Of Sides And Ramming Of Bottoms Lift Upto 1.5 M, Including Getting Out Excavated Earth And Disposal Of Surplus Excavated Earth As Directed, Within A Lead Of 50 Metres: All Kinds Of Soil : Random Rubble Masonry With Hard Stone In Foundation And Plinth Including Leveling Up With Cement Concrete 1:6:12 (1 Cement : 6 Coarsesand : 12 Graded Stone Aggregate 20Mm Nominal Size) Upto Plinth Level And Curing Complete With: Cement Mortar 1:6 (1 Cement : 6 Coarse Sand) Nallah Stone Dry Random Rubble Masonry With Hard Stone In Foundation And Plinth: With Bond Stone. Nallah Stone Pointing On Stone Work With Cement Mortar 1 : 3 (1 Cement : 3 Fine Sand) Flush/Ruled Pointing Providing & Laying Damp-Proof Course 40 Mm Thick With Cement Concrete 1:2:4 (1 Cement:2 Coarse Sand: 4 Graded Stone Agg 12.5 Mm Nominal Size) And Curing Complete Centering And Shuttering Including Strutting, Propping Etc. And Removal Of Form For: Foundations, Footings, Bases Of Columns Etc. For Mass Concrete. Carriage Of Materials By Mechanical Transport Including Loading, Unloading And Stacking Complete Job: Sand/Stone Aggregate Avg Lead Upto 46 Km Cement Avg Lead Upto 12 Km Stone Avg Lead Upto 22 Km Supply Filling And Laying Of Stones Avialible At Site Labour Charges Into Wire Crates Tightly Hand Packed Including Tipping Of Crates With Equipments Including Cost Of Wire Crate/ Earth Work Cutting With All Cost And Carriage Crate At Site Complete Job As Per Direction Of Engineer Incharge At Site Supply Filling And Laying Of Stones Into Wire Crates Tightly Hand Packed Including Tipping Of Crates With Equipments Including Cost Of Wire Crate/ Earth Work Cutting With All Cost And Carriage Of Stones And Crates Complete Job. As Per Direction Of Engineer Incharge At Site
|